Wednesday, June 3, 2009

La Colosa Gold Mine, Colombia

The La Colosa porphyry gold project is located 150km west of Colombia’s capital city, Bogota, in the district of Tolima. La Colosa is the second major greenfield discovery in Colombia. AngloGold Ashanti explored in the site in 2006, followed by initial JORC-compliant resource estimates in May 2008.

Resource delineation drilling was undertaken during 2007 and by the end of the year around 12,000m of diamond drilling (in 42 drill hoes) had been completed.

The company announced an initial inferred resource of 468.8 million ounces at 0.86g/t gold totalling 12.9 million ounces.

The drilling and resource modelling at La Colosa is defined as a porphyry system with a grade of more than 0.3g/t Au extending over a strike length in excess of 1,500m. It has an inferred mineral resource of 381.4Mt at 1.00g/t Au for 12.3 million ounces of gold at a gold price of $1,000 per ounce and a lower cut-off of 0.3g/t Au.
"La Colosa is the first major gold porphyry discovery in the Andes."

Based on present drilling and geochemical observations, La Colosa’s mineralisation systems, along with the La Belgica sector, remain open to the north, south and east.

La Colosa is the first major gold porphyry discovery in the Andes and AngloGold Ashanti has first mover advantage with granted and application tenements covering an area of around 61,700km².

Drilling activities at La Colosa were suspended in late February 2008 due to environmental requirements. Subsequently, all the necessary documentation was submitted to the relevant authorities for approval. The drilling activities are expected to resume in April 2009.

During 2008, the mineral resources increased by 33.4 million ounces to 241.0 million. The project enabled company to add 12.9oz of gold to its resource base by the end of 2008.

Future output is estimated at 700,000oz of gold.


You can read completely at http://www.mining-technology.com

Monday, May 25, 2009

Kalgold Gold Mine, South Africa

Kalgold mine is an open pit operation owned by South Africa-based Harmony Gold Mining Company Limited. Located 60km south of the town of Mafikeng in the North West Province of South Africa, the mine includes a Carbon in Leach (CIL) plant.

Harmony acquired Kalgold in July 1999, and in November 2003 the group entered into an agreement to sell the mine to Afrikander Lease Limited. However, the contractual obligations were not met and subsequently the agreement was cancelled in March 2004.

Production disruptions at Kalgold

Water shortages followed by heavy rainfall and electric disruptions had a negative effect on production at Kalgold in 2007 and 2008, leading to a loss of production, which was compounded by numerous instances of plant breakdowns.

The disruptions caused 3% decline in the volumes milled at Kalgold in 2008. However, a significant improvement in the gold grade to 1.89 gram per tonne during the year helped Harmony to more than double its gold production from the mine.


Geological information

Operations at the Kalgold mine are located within the Kraaipan Greenstone Belt near Mafikeng town.

The belt is a part of the larger Amalia-Kraaipan Greenstone terrain. It comprises linear belts of Archaean meta-sedimentary and meta-volcanic rocks trending northwards and separated by granitoid units.

Shallow dipping quartz veins in the form of swarms or clusters within the steeply dipping magnetite-chert banded iron formation are found in the mineralisation.

The largest orebody encountered in the region is the D Zone, which has been mined extensively along a strike length of 1,300m within a single open pit operation. Mineralisation was also found in the A Zone; the Mielie Field, adjacent to the D Zone; A Zone West (along strike to the north of the D Zone); and the Watertank and Windmill areas to the north of the A Zone.

You Can Read Completely at "www.mining-technology.com"

Monday, January 19, 2009

Omagh Gold Project, United Kingdom


The Omagh gold project, situated in Crown Estate prospecting licence OM 1/03, covers an area of about 189km2, straddling the counties of Tyrone and Fermanagh in western Northern Ireland.

Omagh Minerals Ltd (OML), a wholly owned subsidiary of Canadian company Galantas Gold Corp, owns the freehold to the site as well as the prospecting and mining rights, planning consent and infrastructure.

Following the discovery and exploration of vein gold at Curraghinalt in the Sperrin Mountains by Ennex International in the mid-1980s, Riofinex North Ltd began exploration of the geological inlier known as Lack, named after a local village. Riofinex discovered the gold-bearing Kearney vein structure – the current focus of production – and the surrounding swarm of gold veins during the course of an exploration and resource delineation programme.

In 1990, the project was transferred to OML, which was acquired in 1997 by Ontario-based European Gold Resources. In 2004, the company was renamed Galantas – Gaelic for ‘elegant thing’.

The $20m project has been funded through a series of stock issues. The payback period is estimated at 2.7 years from July 2008.



Geology

The licence includes a 72km2, partly fault-bounded, Lack inlier of upper Proterozoic age and upper Dalradian metamorphic rocks, surrounded by lower Palaeozoic rocks. The Dalradian of the eastern half of the Lack inlier, where most of the exploration work has been done, consists mainly of a series of quartz-feldspar-muscovite-chlorite schists of varying composition.

Mineralisation within the structures consists of quartz veins up to a metre wide with disseminated to auriferous sulphides, predominantly pyrite and galena, with accessory arsenopyrite and chalcopyrite.



Resources

The mine consists of several veins of varying ore grades. May 2008 estimates put total measured and indicated resources at 104,000oz Au and inferred resources at 295,800oz Au. The resources are independently reported to CIM code and Canadian National Instrument 42-101 standard. Extraction of only two of the veins, of which Kearney is the largest, is expected to give a mine life of 4.6 years.



Production

The Kearney vein is being mined by open-pit methods. The rock is sufficiently naturally fractured that blasting is not required.

There are two types of overburden within the pit: peat and glacial till. Both are being stockpiled for use in later restoration. Below the till lies bedrock, both barren country material and mineralised gold resource. The ore is being mined using a narrow excavator bucket then taken to a nearby processing plant by dump truck.



Processing

The processing plant uses conventional crushing, grinding and flotation to produce a lead sulphide concentrate. The ore is crushed in three stages (two-stage for the smaller pieces) and ground with water in a ball mill to fine sand, about half of which is less than 75 microns. Some of the ground material is treated by gravity methods but most of it is mixed with water, foaming and flotation agents, then passed to froth flotation tanks. The foam is then taken from the top of the cell, cleaned and dewatered and the resultant concentrate packed for shipment and sale.

First concentrate was shipped in February 2007. Concentrate enhancement experimentation is taking place. Froth washing has so far proven more effective than use of a regrind circuit.

During 2007 Galantas processed ore containing 6.24g/t gold and achieved a recovery of 89%. This improved during the year such that, after May 2007, the average recovery was 90% and the average after November 2007 was 92%.

Recovery for January and February 2008, at 83g/t, was similar to the 2007 average but the average for March and April 2008 rose to 106g/t.

The concentrate is sold via an offtake agreement with Xstrata subsidiary Falconbridge, of Canada, while part of the recovered gold is designed and sold by Galantas Irish Gold through retail channels such as Galantas-branded 18ct gold jewellery.

Power is provided by a 1,000kVA genset, a 400kWA genset and an 80kVA genset, although not all are in use at any one time. Galantas anticipates that mains electricity will be provided in due course.

Tuesday, December 30, 2008

Olympic Dam Copper-Uranium Mine, Adelaide, Australia

The Olympic Dam copper-uranium mine and plant is situated in South Australia, 580km north-west of Adelaide. Opened in 1988, Olympic Dam is wholly owned and operated by WMC Resources, which discovered the deposit in 1975. A A$1,940m expansion programme was completed in 1999, raising its capacity to 200,000t/y of copper and 4,300t/y of uranium, plus gold and silver. In mid-2005, BHP Billiton gained control of WMC Resources in an A$9.2bn takeover.

In 2007 BHP Billiton announced that it would undertake a A$6bn–A$7bn expansion of the Olympic Dam mine. The company says that annual ore production will increase up to 70 million tonnes, a seven-fold increase if the expansion proceeds. Copper production will increase from approximately 180, 000t a year to approximately 730,000t.

This would include 500,000oz of gold, 500,000t of copper and 15,000t of yellowcake. Existing average gold production is 80,000oz pa. The additional proven reserves of uranium now make Olympic Dam one of the most promising uranium mines in the world.

Intierra's Minmet data base puts current Olympic Dam proven-probable reserves at 756 million tonnes grading 1.5% copper, 0.5kg/t U308, 0.5 g/t gold and 3.1g/t silver. The measured to inferred resources were 3.214 billion tonnes at 1.025% copper, 0.337kg/t U308, 0.442g/t gold and 2.144g/t silver. On these figures, without improved grades or increased tonnage, Olympic Dam has proven reserves of a contained 12.153Moz gold and contained resources of 45.62Moz.

The results of the study ended much speculation within the mining and investment communities, which were especially abuzz about the potential upgrade of gold reserves.

Once fully complete, the expansion would make Olympic Dam the biggest mine in the world. Concerns have naturally been voiced about how the necessary infrastructure will be funded and deployed. Finding skilled labour will be another challenge.

GEOLOGY AND RESERVES

The deposit occurs in the basement rocks of the Stuart Shelf geological province in the north of South Australia, west of Lake Torrens. Mineralisation consists of medium-grained chalcopyrite, bornite and chalcocite, fine-grained disseminated pitchblende, gold, silver and rare earth minerals that occur in a magnetic hydrothermal breccia complex beneath 350m of overburden. The ore occurs in distinct zones that determine the mine access and layout.

As of September 2008, the total ore reserves at Olympic Dam stood at 473Mt, up from 399Mt in 2007, grading 1.86% copper and 0.6kg/t U3O8..

MINING

The current scope and logistical demands of the mine will be increased by a few orders of magnitude once the expansion gets into full swing. The mine will gradually be transformed from an underground operation to open pit.

Three vertical shafts and a decline access the orebody, which is worked using a variation of sublevel open stoping. Each stope may contain 300,000t of ore. Drill drives are driven on the stope centre line and blastholes drilled in vertical rings. These are charged with ANFO and detonated with shock tube detonators. The drilling fleet comprises Atlas Copco and Tamrock production rigs, with development being carried out using two Tamrock (now Sandvik) jumbos. Atlas Copco has supplied two modified Simba H4356S production drilling rigs.

Stopes are backfilled with cemented aggregate of crushed 'mullock' (waste rock), deslimed mill tailings, cement and pulverised fuel ash (PFA). Automation has done much to reduce production costs at Olympic Dam. Innovations include the automated underground haulage system and the 'smart' loader, a robotics-driven, decision-making underground ore carrier.

ORE PROCESSING

Processing facilities consist of a copper concentrator, hydrometallurgical plant, copper smelter, sulphuric acid plant, copper and gold/silver refineries. Recent expansions included a Svedala autogenous mill, additions to the flotation sections, two counter-current decantation thickeners, an electric slag-cleaning furnace, a new anode furnace gas-cleaning plant and additional electro-refining cells.

Copper is recovered primarily by copper sulphide flotation from slurry before the copper concentrate is smelted and electro-refined to high-purity copper.

Wastes generated during electro-refining are treated to recover gold and silver. After treatment by flotation, the finely-crushed ore is leached with sulphuric acid to dissolve uranium and any remaining copper. The leach liquor is processed in the solvent extraction plant to separate the residual copper and uranium streams. Copper is recovered by electrowinning and uranium converted to yellowcake and calcined uranium oxide.

Installation of two pulsed columns has increased uranium recovery from solution from 90% to about 97%. These columns use an air pulse to mix the acidic and organic solutions, providing better contact for the chemical reaction involved in transferring the uranium from one to the other.

Copper cathode sheets are transported by truck within Australia and to Port Adelaide for export. All uranium oxide produced at Olympic Dam is exported. The gold plant became fully operational in 2000. A fire in 2002 at the solvent extraction / electrowinning plant cost over A$300m to repair, while WMC also spent A$127m on renovating the copper smelter during 2003.

EXPANSION

At the end of October 2008, BHP Billiton announced that it expects to complete the first of the mine's five-stage expansion by 2013, boosting annual production capacity to 200,000t of copper, 4,500t of uranium and 120,000oz of gold. Up to the end of the business year on 30 June 2008, Olympic Dam produced 169,000t of copper cathode, 4,144t of uranium and 80,517oz of gold.

The expansion will be followed by a staged development of an open pit, with an eventual target output of 730,000t of copper and 19,000t of uranium. The company also said it is looking at shipping copper concentrate directly to smelters in China, which will cut the cost of producing cathodes at the mine.

ENVIRONMENT

Olympic Dam maintains storage facilities for all waste products. The plant has been designed so that any spillage of ore, concentrate or process slurries can readily be returned to the process circuit. The plant also includes comprehensive air pollution control equipment and both air emissions and noise are monitored. Extensive radiation monitoring of personnel and the environment is ongoing.

The Australian and South Australian Governments jointly determined that the proposed Olympic Dam expansion must be formally assessed through an Environmental Impact Statement (EIS).

Tuesday, December 23, 2008

Sunrise Dam, Australia


The Sunrise Dam gold mine lies on the eastern shore of Lake Carey in the northern goldfields of Western Australia, some 770km north-east of Perth, 220km north/north-east of Kalgoorlie and 55km south of Laverton. It is 100% owned by AngloGold Ashanti.

Formerly just an open cut mine, the operation comprises of both a large open pit and an underground mine. Each commenced operations in 1997 and 2003 respectively.

The mine achieved record production of 600,000 oz for 2007, largely due to the GQ zone in the open pit. Just under 80,000 oz was sourced from the underground mine.


The conversion of the mine’s diesel power station to liquefied natural gas (LNG) went according to plan in 2007 and the new LNG facility will start operating in the second quarter of 2008. AngloGold says that this will lead to drastically reduced energy costs as well as reduced greenhouse emissions.

Capital expenditure for the year amounted to A$35m (US $30m), and was spent mostly on the underground operation. Major items of expenditure included capitalised underground development in the Cosmo lode and the Sunrise Shear Zone decline, as well as costs relating to the north wall cutback and the expansion of the village.

Some 360 people are employed at the mine, 255 of whom are contractors.



Geology and reserves

Gold ore at Sunrise Dam is structurally and lithologically controlled within gently dipping high-strain shear zones (for example, Sunrise Shear) and steeply dipping brittle-ductile low-strain shear zones (for example, Western Shear). Host rocks include andesitic volcanic rocks, volcanogenic sediments and magnetic shales.

Total ore reserves as of the end of 2007 were 552,000 oz (underground), 1.1m oz (open pit). Total mineral resources were 3.078 m oz Au.



Mining and processing

The mine comprises a large open pit, which is now in its 11th year of operation, and an underground mine, which began production in 2003. All the mining is carried out by contractors and ore is treated in a conventional gravity and carbon-in-leach (CIL) processing plant which is owner-managed.



Production and costs

Production for 2007 rose by an expected 29% to hit a record 600,000oz, compared to 465,000oz for 2006.


The GQ zone in the open pit provided the anticipated large volumes of high-grade ore, which accounted for the increase in annual gold production. Some 80,000oz of gold came from the underground mine. Progress was made in developing access to the Cosmo, Dolly and Watu lodes, and 2,000m of underground capital development and 6,100m of operational development were completed. A total of 67,400m of diamond drilling was also completed.

Processing plant throughput in 2007 was 3.8Mt, slightly lower than the record throughput of 3.9Mt in 2006. Total cash costs fell by 8% to A$364/oz (up by 3% in US dollar terms to $306/oz).

Despite rising costs, the greater volume of ore mined, and the high value of the Australian dollar, the increase in production, due primarily to the higher grade of ore mined, resulted in the decrease in cash costs, year-on-year.

Tuesday, December 9, 2008

Blue Ridge PGE Project, South Africa

Ridge Mining's Blue Ridge project is situated on the Blaauwbank farm, about 30km south-east of Groblersdal, on the eastern limb of the Bushveld Igneous Complex (BIC), South Africa.

Ridge Mining started exploration work on the project in 2001 and completed a feasibility study at the end of 2005. Mine development, estimated to cost $170m, began in January 2007.

The project is a 50:50 joint venture between Ridge Mining and BEE partner Imbani, which had invested more than $100m of equity by December 2008. In December 2007, project finance agreements were signed with a consortium of banks consisting of the Development Bank of Southern Africa, the Industrial Development Corporation of South Africa, Standard Bank and Investec Bank for R715m, giving full finance through to first production, which is set for the end of 2008.

The cash operating cost assumption for Blue Ridge is $660/oz to produce platinum, palladium, rhodium and gold, giving an expected payback period of five years.

Geology

The eastern limb of the BIC, like the rest of the complex, consists of distinct rock strata, including three PGE-bearing layers known as reefs, with one being the UG2 chromitite reef.

The PGEs in the UG2 chromitite occur primarily in discrete mineral phases, varying from sulphide assemblages (predominantly cooperite, braggite, malanite and laurite) to those consisting of a significant component of alloys (such as Pt-Fe alloy) or various telluride, bismuthinide, bismuthotelluride, arsenide and sulpharsenide phases.

Resources

Total Measured, Indicated and Inferred resources are put at 89.9Mt, which includes 38.7Mt of Indicated resources from the neighbouring Millennium area, acquired by Ridge in March 2008, giving a contained 4PGE figure of 9.2Moz at an average grade of 3.2g/t. Total Proved and Probable reserves are nearly 22Mt to give a contained 4PGE figure of nearly 2.3Moz at 3.3g/t.

Production

The mine development is based on two decline shafts; a 700m-long belt decline, which will be used for transporting ore, and an 850m-long truck decline. During 2008 work focused on opening up production levels and faces in readiness for mining to begin in earnest. The plan is to mine only the higher grade portion of the reef, using a method called "Efficient Cut".

Before the plant was commissioned, Ridge Mining stockpiled more than 200,000t of ore – about two months’ worth of throughput for the plant in full production – allowing enough ore to be processed through the concentrator plant while the underground workings continue the ramp-up to full capacity, which is planned for the middle of 2009.

Annually the mine is forecast to produce about 75,000oz of platinum, 35,000oz of palladium, 22,000oz of ruthenium, 13,000oz of rhodium, 2,500oz of iridium and 1,500oz of gold over its initial 18-year life.

Processing

The ore will be processed using crushing, milling and flotation, then milling and flotation again to produce a concentrate. The ore will be fed through a primary ball mill and into primary roughers and cleaners, from where some of the feed will go to a care thickener and the rest to a secondary ball mill and roughers and cleaners, then on to tails thickeners. The concentrator plant is next to the entrance to the main decline shaft, which has a conveyor belt to bring the ore to the surface. Processing testwork show recoveries into concentrate of 82%-86%.

Once the mine has achieved steady-state production, Ridge Mining plans to boost its performance by re-treating the tailings and processing ore from Millennium, which it acquired from Lonmin in March 2008 for an undisclosed amount. Millennium has raised the original resources at Blue Ridge by more than 70% and allows the company to mine at a higher rate because it gives a greater strike length. An offtake agreement has been signed with Impala Refining Services for all the production from the mine.

Water will come from a combination of boreholes and the nearby Loskop Dam.

For electrical power, Ridge Mining signed up with state utility Eskom before the moratorium on new supply contracts. The first power line, which will supply about 70% of the mine’s requirements of 17MVA at full production, was installed in November 2008, with the rest due in 2009. To cater for any shortfall in the interim and for any unforeseen outages, however, Ridge Mining has back-up diesel generators that can provide all the mine’s power, albeit at higher cost.

The process plant, which will be operated by Minopex, was built by Bateman Engineering; Murray & Roberts Cementation are responsible for the underground mine development.

Wednesday, December 3, 2008

Boddington Gold Mine, Perth, Australia


The Boddington Gold Mine (BGM) is about 130km south-east of Perth in Western Australia. The largest undeveloped gold mine in the country, it is poised to become the highest producing mine once production ramps up over the next few years.

The $2.4bn project was initially a three-way joint venture between Newmont Mining, AngloGold Ashanti and Newcrest Mining. In 2006 Newmont bought Newcrest’s 22.22% share, bringing its interest to 66.67% and ending any Australian ownership. AngloGold owns the remaining 33.33%.
The original, mainly oxide open-pit mine was closed at the end of 2001.

Recent exploration has identified an extensive 19.57Moz gold bedrock resource, the basis of the Boddington Gold Mine Expansion Project. Approved in 2006, this will involve mining the hard gold/copper ore that lies beneath depleted oxide pits at Boddington’s original mine site.

The project has an attributable capital budget of between A$0.8bn and A$0.9bn. At year-end, the overall project was approximately 65% complete, with engineering and procurement activities nearing completion. Construction of the treatment plant was approximately 32% complete. At its peak the project is expected to employ some 2,000 workers. Once production begins it is expected that around 650 full-time staff will be required.

Based on the current plan, mine life is estimated to be more than 20 years, with attributable life-of-mine gold production expected to be greater than 5.7Moz.

Newmont and Anglo have focussed their exploration activities on the poorly explored areas of the greenstone belt outside the already identified Boddington Expansion resource. The exploration strategy is to identify the resource potential of the remainder of the greenstone belt, with the emphasis on high-grade lode-type deposits.


Geology and reserves

The BGM is located within the Saddleback Greenstone Belt (SGB), a fault-bounded sliver of Archaean volcanic and shallow level intrusive rocks, surrounded by granitic and gneissic rocks. The SGB produced over 6Moz of gold and is a highly prospective exploration area for further gold mineralisation in both large tonnage stock-work gold resources and high-grade lode-type gold resources.

As of the end of 2007, proven ore reserves at Boddington were 1.618Moz. Total mineral resources (measured, indicated and inferred) were 10.3Moz.


Mining

Built on the footprint of the original Boddington Gold Mine, the operation involves open cut mining from two large pits and is expected to produce an average 850,000oz of gold and 30,000t of copper a year for more than 20 years.

Production is due to commence in late 2008/early 2009 under the management of the Boddington Gold Mine Management Company, a 100% Newmont-owned company.


Production

Average attributable gold production in the first five years will be between 320,000oz and 350,000oz a year, while on an average life-of-mine basis, attributable production is estimated to be between 250,000oz and 270,000oz a year. Copper production, which will be sold as concentrate, is expected to be around 30,000t per year.

Monday, December 1, 2008

Cripple Creek and Victor, Gold Mine, Colorado Springs, USA





The Cripple Creek and Victor gold mine (CC&V) lies southwest of Colorado Springs in the US state of Colorado. For many years the Cripple Creek Mining District was a series of underground mines. Following the start in 1994 of the CC&V Cresson Project today it is a low-grade, open-pit operation.

In March 1999 AngloGold Ashanti acquired the Pikes Peak Mining Company, and interests in the Cripple Creek & Victor Gold Mining Company (CC&V) and the Jerritt Canyon Joint Venture. The stake in the Jerritt Canyon Joint Venture was sold to Queenstake in mid-2003.

Up until mid-2008 the CC&V mine was a joint venture two-thirds owned by AngloGold Ashanti with Golden Cycle Gold Corporation owning the balance. In mid-2008 AngloGold completed a full acquisition of Golden Cycle which resulted in its taking 100% ownership of the CC&V mine.

Development drilling, engineering analysis and permitting requirements for the mine life extension project are under review. The proposed extension is to include the development of new sources of ore and an extension to the additional heap-leach facility.

AngloGold says that gold production at CC&V will increase to between 290,000oz and 300,000oz for 2008 at a total cash cost of between $298/oz and $308/oz. Operational initiatives have been taken to minimise growth in the leach-pad gold inventory in 2008.

Capital expenditure of $28m is scheduled for 2008, to be spent mostly on major mine equipment purchases and the mine life extension project. The mine currently employees 338 full-time workers and 67 contractors.

In 2007 investigators revealed that a gang of employees had stolen some $3m-worth of gold from the mine since 1999. A number of former staff are now serving time in prison.


Geology and reserves

The Cripple Creek mining district is centred on an intensely altered alkaline, tertiary-aged, diatreme-volcanic, intrusive complex, approximately circular in shape, covering 18.4km2, and surrounded by Precambrian rocks. The rocks consist of biotite gneiss, granodiorite, quartz monzonite and granite.

The intersection of these four units and regional tectonic events formed an area of regional dilation which subsequently localised the formation of the tertiary-aged volcanic complex.

Higher-grade pods of mineralisation occur at structural intersections and/or as sheeted vein zones along zones of strike deflection. High-grade gold mineralisation is associated with K-feldspar + pyrite +/- carbonate alteration and occurs adjacent to the major structural and intrusive dyke zones. The broader zones of disseminated mineralisation occur primarily as micro-fracture halos around the stronger alteration zones in the more permeable Cripple Creek Breccia wall rocks.

The average depth of oxidation is 120m and is also developed along major structural zones to even greater depths. Individual orebodies can be tabular, pipe-like, irregular or massive. Individual gold particles are generally less than 20 microns in size and occur as broad zones of low-grade gold-pyrite mineralisation or as fracture zones containing high-grade gold-silver tellurides. Gold occurs within hydrous iron and manganese oxides and as gold-silver tellurides. Silver is present but is economically unimportant. Gold mineralisation can be encapsulated by iron and manganese oxides, pyrite, K-feldspar alteration and quartz.

Proven ore reserves as at December 2007 were 118,904t at a grade of 0.028. Total mineral resources (measured, indicated and inferred) were 494,124t.


Mining and processing

Up until the 1960s The Cripple Creek Mining District was mined initially by multiple underground operations until the 1960s, after which mining activities ceased for a period. Small scale surface mining started in the 1970s until the start of large-scale surface mining in 1991, leading eventually to the start in 1994 of the CC&V Cresson Project. Today, CC&V is a low-grade, open-pit operation.




Ore processing

The ore is treated using a valley-type, heap-leach process with activated carbon used to recover the gold. The resulting doré buttons are shipped to a refinery for final processing.


Production add costs

Production at CC&V fell slightly in 2007 to 282,000oz from 283,000oz in 2006. A total of 23Mt was placed on the heap-leach pad.

AngloGold attributed the production decline to the greater distance over which the gold-bearing leach solution had to be transported from the higher stacked ore to the leach-pad liner. This decline was compounded in the third quarter by delayed production from the leach-pad stacking levels.

There was an 8% increase in cash costs for 2007 to $269/oz from $248/oz in 2006, due in larger part to higher commodity prices, especially diesel fuel. This more than absorbed savings arising from lower contractor costs, while creeping inflation in the US economy added to the burden.

The higher gold price received throughout 2007 contributed to a 222% increase in adjusted gross profit to $74m. Capital expenditure for the year amounted to $23m (2006: $13m).

Wednesday, November 26, 2008

TauTona, Anglo Gold, South Africa



In 2006 AngloGold Ashanti commenced a project to extend its South African TauTona gold mine to 3.9km. This was completed in 2008 making it the world’s deepest mine, surpassing the 3,585m deep East Rand Mine by a good distance. The name TauTona means "great lion" in the Setswana language.

The TauTona mine exists within the West Witts area not so far from Johannesburg in South Africa, near the town of Carletonville. TauTona neighbours the Mponeng and Savukamines, and TauTona and Savuka share processing facilities. All three are owned by AngloGold Ashanti.

Production at TauTona fell to 409,000 ounces in 2007, down from 474,000 ounces in 2006, due to increased seismic activity.

This required a review of the practice of mining of shaft pillars and high-grade remnants, and delays to the build-up in volume caused by opening up of the sequential grid. Capital expenditure in Siguiri was R2.5bn ($US71m) in 2007, with 56% committed to the development of ore reserve.

TauTona accounted for 7% of AngloGold Ashanti’s total 2007 gold production.

The mine was originally built by the Anglo American Corporationwith its 2km deep main shaft being sunk in 1957, with operations starting in 1962.

Since its construction two secondary shafts have been added bringing the mine to its current depth. The mine today has some 800km of tunnels and employs some 5600 miners. It is an extremely dangerous environment, with five workers losing their lives in 2007.

The mine is so deep that temperatures in the mine can rise to dangerous levels. Air conditioning equipment is used to cool the mine from 55°C down to a more tolerable 28°C. The rock face temperature currently reaches 60°C.

The journey to the rock face can take one hour from surface level. The lift cage that transports the workers from the surface to the bottom travels at 16 meters a second. The mine has also been featured on the MegaStructures programme produced by National Geographic.


Geology and reserves

The TauTona mine exists within the West Witts area slightly South West of Johannesburg in the North West of South Africa.

Two reef horizons are exploited at the West Wits operations: the Ventersdorp Contact Reef (VCR), located at the top of the Central Rand Group, and the Carbon Leader Reef (CLR) near the base. Owing to nonconformity in the VCR, the separation between the two reefs increases from east to west, from 400m to 900m. TauTona and Savuka exploit both reefs while Mponeng only mines the VCR. The structure is relatively simple with rare instances of faults greater than 70m.

The CLR consists of one or more conglomerate units and varies from several centimetres to more than 3m in thickness. Regionally, the VCR dips at approximately 21°, but may vary between 5° and 50°, accompanied by changes in thickness of the conglomerate units. Where the conglomerate has the attitude of the regional dip, it tends to be thick, well-developed and accompanied by higher gold accumulations.

Where the attitude departs significantly from the regional dip, the reef is thin, varying from several centimetres to more than 3m in thickness.

Total resources 2,615,000 ounces Measured resources 510,000 ounces Indicated resources 8,106,000 ounces


Mining and processing

Mining operations are conducted at depths ranging from 1.8km down to 3.9km following the recent expansion.

The mine consists of a main shaft system supported by secondary and tertiary shafts. The main mining method is longwall. TauTona shares a processing plant with Savuka. The plant uses conventional milling to crush the ore and a CIP (carbon in plant) to further treat the ore. Once the carbon has been added to the ore, it is transported to the plant at Mponeng for electro-winning, smelting and the final recovery of the gold.


Production

Gold production declined by 14% to 12,714kg (409,000oz) (2006: 14,736kg (474,000oz)), owing to a higher-than-expected fall in the volumes of ore mined. This was due to increased seismic activity in the vicinity of the CLR shaft pillar which is being mined, and at several highgrade production panels, where production was halted for limited periods during the course of the year. Both face length and face advance were negatively affected by seismicity during the year. The increased geological risk from this seismic activity necessitated re-planning regarding mine layout and mining methods.

Monday, November 24, 2008

Martabe, North Sumatra, Indonesia


Following review of the recently completed Definitive Feasibility Study (DFS), Oxiana's Board approved development of the Martabe gold and silver project in December 2007. The Board approval is subject to the receipt of final permits from the Government of Indonesia, which are expected by April 2008.

The Martabe project is seen as one of the more promising undeveloped mineral deposits in Asia, containing extensive proven reserves of gold and silver.

The Martabe Contract of Work (CoW) covers a 2,500km² area, the most significant part of which is the Purnama deposit.

It is a sulphidation epithermal deposit, which was discovered in 1997 through regional stream sediment sampling by Normandy Anglo Asia Ltd. Since then other deposits have also been discovered and resources at Martabe now stand at 6 million ounces of gold and 60 million ounces of silver.

Oxiana became the owner of the Martabe project through the acquisition of Agincourt Resources Limited in early 2007.

The Martabe project is located close to existing infrastructure and facilities and is bisected by the Trans-Sumatra highway. Supplies of grid power and process water are available, and the port of Sibolga is approximately 30km from the site.

Subject to approvals the Martabe project will move into construction in 2008 and then into production at the end of 2009.


GEOLOGY AND RESERVES

Martabe's high sulphidation gold deposits exist within a sequence of tertiary volcanic and sedimentary rocks near a fault splay which is part of the Great Sumatran Fault complex. Episodic fault activity has been responsible for pulses of high-level magmatism and development of multi-stage phreatomagmatic breccias, flow dome complexes, hydrothermal alteration and gold mineralisation observed in the district. Gold mineralisation occurs in a number of deposits over a strike length of 7km.

The most significant and best defined of these is the Purnama deposit, where a resource of 66.7 million tonnes containing 1.74g/t Au and 21.5g/t Ag for a total of 3.7 million ounces of gold and 46 million ounces of silver has been defined by diamond drilling.

Two adjacent deposits, Baskari and Pelangi, plus primary gold potential at depth and other virgin targets are expected to provide upside. Total resources are 6Moz of gold and 60Moz of silver. Reserves are 2.3Moz of gold and 30Moz of silver.


MINING

Mining of the Purnama deposit will be undertaken by conventional open-pit methods with a low average strip ratio of 0.7:1. The processing plant will be a large-scale ore processing plant. The plant and infrastructure will be designed to allow for future expansion.




ORE PROCESSING

Oxiana expects to be treating 4.5 million tonnes of ore per annum using proven SAG and ball milling, and carbon-in-leach (CIL) technology. Recoveries are expected to average 76% for gold and 55% for silver.

Production on average will be 250,000oz of gold and approximately 2Moz of silver per annum over an initial nine-year production life.

Martabe's development cost has been put at $310m and mining cash costs are estimated at $270/oz. First production is expected to start in December 2009.


THE FUTURE

The potential to discover mineralisation elsewhere in the CoW area is considered high and exploration is ongoing at a number of other prospects. Two adjacent deposits, Baskari and Pelangi, plus primary gold potential at depth and other virgin targets are expected to provide upside.

A 5% interest is held in trust for local Indonesian stakeholders.

Wednesday, November 19, 2008

Green from Gold "The Rehabilitation of Golden Cross"


Introduction

Tucked away in a Coromandel valley down a dead end road is a modern New Zealand gold mining success story. Faced with rugged terrain, some of the highest rainfall in the country, and complex geology, the Golden Cross mine has endured cyclones, a major land movement, and antimining misinformation to become a productive operation, and the first modern mine in New Zealand to successfully move into planned closure and final rehabilitation.



above from left: Golden Cross prior to mining in 1990, during active mining in March 1994, and during rehabilitation, March 2001.


The Site
The Golden Cross mine site is situated eight kilometres north-west of Waihi in the Waitekauri Valley at the base of the Coromandel Peninsula. The mine site ranges from 270 metres to 460 metres above sea level on steep to rugged terrain, which receives in excess of three metres of rain per year. The site is bordered on three sides by land controlled by the Department of Conservation, including the ecologically sensitive Coromandel State Forest Park.


A Brief History

Between 1895 and 1920 the Golden Cross underground mine produced just over two and a half tonnes of gold. When the mine closed the site became farmland.

In 1977 two exploration licences were taken out. Initial investigation showed potential. A prospecting licence was obtained in 1980 and a drilling programme commenced in 1981. By mid 1985 exploration had revealed a potentially mineable deposit. Project feasibility followed. An Environmental Impact Report, a mining licence application and applications for water rights were lodge in late 1987. Water rights were granted in 1988. The mining licence was granted in April 1990, having been the subject of an appeal to the Planning Tribunal. Bonds of $12.1 million were required to be lodged to allow the project to proceed.

The new Golden Cross mine began production in December 1991. Mining was by underground and open pit methods. The Golden Cross underground mine was the first underground gold mine to operate in New Zealand since the nearby Martha Mine at Waihi closed in 1952. A skilled workforce was developed mainly by training workers hired locally.


above: Geologists underground at Golden Cross during the active mining phase. Over 11 kilometres of tunnels reaching a depth of 300 metres below the surface were driven through the rock.


Coeur d'Alene Mines Corporation purchased the Golden Cross mine in March 1993 in an 80%/20% joint venture with New Zealand company Viking Mining.

Between December 1991 and April 1998 the mine produced a total of 20.5 tonnes of gold and 52 tonnes of silver with a present day value of approximately $430 million, most of which was spent in New Zealand. At its peak Golden Cross employed 243 staff, as well as indirectly employing approximately 750 people in service and support industries. The company's annual staff payroll exceeded $10 million.

The mine officially closed on 17 December 1998 and became the first modern mine in New Zealand to move into planned closure and final rehabilitation. The area is now used for grazing, wetland and native habitat.


The Mining Operation

Ore hauled from the underground and open pit mines was processed at the mill located on the site. Over 11 kilometres of tunnels reaching a depth of 300 metres below the surface were driven through the rock. Waste rock was used to backfill the tunnels and build the tailings impoundment. Ore was crushed then put through the mill to remove the gold and silver. Once the precious metals had been removed, the remaining fine rock and water mix, now called tailings, was pumped to the tailings dam. Cyanide used in the gold extraction process was recycled using a new, patented process. This was a world first for its use on a commercial scale.


above left: The Cyanisorb plant recycled cyanide used in the gold extraction process to the leach circuit for reuse.
above right: The Golden Cross process plant with the Coromandel State Forest in the background, 1997. The plant has since been removed and the area rehabilitated.

The waste rock embankment that impounded the tailings was constructed with suitable rock from the open pit. On the surface the area may just look like a hill and a lake, but it is actually a very carefully engineered structure. It consists of a series of layers and zones, each of a different material, and each carefully placed. In addition the structure features an underground drainage system. The construction of the dam took place over a number of years in a series of lifts as material became available and storage capacity was required. Fault zones run through the area, so the dam was designed and built to withstand a Maximum Credible Earthquake much larger than the 1931 'quake that devastated Napier which measured 7.9 on the Richter scale.



above: The waste rock embankment is a carefully engineered structure consisting of a series of layers and zones.

Tailings from the processing plant were pumped through pipelines to the tailings dam. Excess water was decanted and piped to the water treatment plant before discharge.

The dam contains over five million tonnes of tailings. As it was filled, the tailings consolidated. At closure a cap of fill and topsoil was placed around the perimeter of the dam extending out over the tailings. The area was contoured and revegetated. The central area was left as a body of water that drains clean water through the outlet channel into the Waitekauri River.



above: As part of the rehabilitation process, staff lay geotextile cloth around the perimeter of the tailings pond. Clay and topsoil is then layered on top and the area revegetated.


Environment

New Zealand's permitting and operating requirements are amongst the most stringent in the world. Numerous Resource Consents require monitoring and reporting.

Environment Waikato took the lead role under the RMA for environmentally related issues with Hauraki District Council occupying the role of second tier regulator behind the regional council.

From the original planning stage it was obvious that effective water management would be the key to successful environmental management of the project.

Steep terrain and high rainfall on site required the mine to use an advanced water management system. During operation a series of diversion drains collected water from surrounding hills and diverted it away from the site, into the local stream system. Underground drains collected any natural or tailings seepage from the tailings impoundment area and directed this water to the water treatment facility. Water pumped from underground was directed to settling ponds or the water treatment plant prior to discharge into the Waitekauri River.



above left: The water treatment plant. above right: Monitoring water on site.


All water on site was monitored according to a rigorous quality and quantity schedule. At the water treatment plant, in addition to a comprehensive water quality monitoring system, juvenile rainbow trout were used to establish a real-world real-time biomonitoring system to monitor the potential effects of discharge water on the receiving stream ecology. Three test aquaria were set up; one contained 100% river water as a control, another 20% water treatment plant discharge and 80% river water, and another 100% water treatment plant discharge. Water was continuously pumped through the aquaria. Treated water was taken from the retention pond 6–12 hours before planned discharge. If fish appeared distressed the discharge to the river could be stopped prior to that water entering the discharge pipe and the water treatment plant put into recycle so that potential problems could be identified and rectified.

This was the first use of continuous effluent biological monitoring in New Zealand.


above: Juvenile rainbow trout became the modern equivalent of the miners' canaries when they were used to establish a biomonitoring system to monitor the potential effects of discharge water on the receiving stream ecology.

During operation any potential long-term effects of the mine discharge into the Waitekauri River were assessed by monitoring the plants and animals that live in the aquatic environment. Changes in the abundance and distribution of aquatic life are regarded as reliable indicators of an effect. Independent studies of algae, macro invertebrates (e.g. snails, caddis fly) and fish were conducted. Annual analyses of fish tissue for bioaccumulation were also performed. Regulatory agencies were also involved, cross-checking results and providing independent data.



above left: Regular monitoring of the Waitekauri River. above right: Over 100,000 thousand native trees and shrubs have been planted in and around the mine site.

The on site and in steam biomonitoring programmes have shown no measurable impacts to fish or other aquatic organisms during the operation of the mine.

In addition to its regulatory requirements the company undertook an extensive programme of rehabilitation and enhancement in line with its philosophy of 'Producing and Protecting'. This was a voluntary initiative by the mine and has lasting benefits:

1. Recognised stands of native trees have been extended to establish local corridors with similar stands and enhance wildlife habitat.

2. Riparian habitat enhancement programmes were instituted to protect stream banks from erosion and increase habitat quality both in-stream and on riparian boundaries. This has involved co-operating with local farmers to exclude stock from riparian areas.
3. Over 100,000 native trees and shrubs have been planted on and around the mine site.

4. Swampy areas located away from the riverbed were fenced and planted with native species to encourage wetlands establishment and enhancement.

Plant material was generated from seed eco-sourced from the local area and from seedlings raised at a local nursery to preserve the local vegetation's distinct genealogy.


Consultation

The Joint Venture has benefited from regular ongoing consultation with a Peer Review Panel and a local Community Consultative Group. Initially developed during the operational phase of the mine, both groups have continued through into the closure phase. The Peer Review panel members were firstly approved by Environment Waikato and then jointly appointed by Environment Waikato and Coeur Gold.



above: Local residents and members of the Community Consultative Group meet on site to observe rehabilitation progress in 1998.


Specific conditions of the Water Rights required the establishment of a Peer Review Panel to assist Regional Council staff assess the technical compliance of the operations. The panel members were appointed and funded by the company, but were independent of it, and reported to council staff. The Peer Review Panel provides assurance to the regulating authorities that the ongoing onsite works conformed to good industry practice. The perspective provided is that of an objective industry professional. The system worked extremely well in practice with panel members providing balanced insight for council staff on industry good practice in specialised fields of engineering, hydrology, geochemistry, revegetation, and later landslide mitigation and mine closure. The panel removed the problems that industry sometimes experiences when trying to present complex technical material to council staff, while at the same time providing council staff with a degree of comfort that their decisions were based on expert recommendation.

The Community Consultative Group has met on a regular basis for four years. The group is comprised of Regional Council staff members, District Councillors, environmental groups, iwi, and local residents. Regular site visits have been well attended by members of the CCG and the local community.


Land Movement Remediation
In mid 1995 routine monitoring for a future raise of the tailings impoundment identified a re-activation of historic land movement beneath the impoundment. This deeply seated movement was ultimately determined to be occurring over an area of one square kilometre, where a slab of ground up to 100 metres thick was moving slowly down-slope on an old slip surface.


above: A slab of ground up to 100 metres thick on which the tailings dam was built was moving slowly downslope on an old slip surface,

The company notified regulatory agencies and held public meetings to discuss the situation and address public questions and concerns. A formal Community Consultative Group was established to keep local people informed of site developments.

The media struggled to come to terms with the situation. Used to dealing with disaster scenarios, they had neither the technical knowledge nor the vocabulary to adequately explain the situation. The company produced an eighteen minute video explaining in layperson's language the situation and likely remedial action. This was widely circulated. At the same time a world class investigation and remedial measures programme was implemented at a cost of $27 million.

above left: GPS monitoring of land movement. above right: Monitoring of water quality at horizontal bores.

Throughout 1996 the Golden Cross mine site became perhaps the most measured and studied piece of ground in the world as mine staff and experts from New Zealand and overseas worked to first identify the problem and then work out how to deal with it.

The solution took several forms. To reduce groundwater pressure and lubrication of the slip surface where movement was occurring, a series of horizontal drainage holes was drilled at numerous sites. A drainage tunnel between four and five metres in diameter was driven through the rock some 15 metres below the slip surface. Holes bored upwards into the slip surface drained more water. Water volumes in the tailings impoundment were reduced. A saddle filter buttress was constructed of rock quarried nearby to add strength to the tailings impoundment structure.

Throughout all of these operations groundwater and surface water were constantly monitored. Water of a suitable quality was released off site. If necessary, water was diverted to holding or settling ponds for further treatment.

By late 1996 movement rates had been reduced significantly. By late 1997 the problem had been generally controlled, and by 2000 the annual rate of movement detected was less than the annual uprising of the Southern Alps.

Throughout all of this time the structural integrity of the tailings impoundment was maintained.


Closure
All mines eventually close. It is how they close that is vitally important. In the past the traditional definition of mine closure was to surrender the mining licence and walk away.
This definition no longer applies. Changes in the industry have evolved in line with changes in public expectations of stewardship for the future. Modern mines are planned with closure in mind.



above left: Fertiliser application is an integral part of the rehabilitation process. above right: Cattle graze on rehabilitated pasture in 1999. In the background the removal of the process plant is almost complete.


Today, mine closure is an integral part of the mining cycle, and is investigated and planned for before a mine begins to operate. Mine sites are rehabilitated and stabilised so they are suitable for a sustainable land use that is compatible with the surroundings. Former mine sites in New Zealand are now being used for farming, forestry, recreation and conservation.

Effective closure involves a range of issues. Closure must meet all regulatory requirements as laid down in the conditions on the Mining Licence and Resource Consents. In addition, human resource management and community involvement and consultation add a social facet to the procedure.

Rehabilitation activities at a modern gold mine include: decommissioning the mine, providing surface drainage and erosion protection across the entire site, establishing self sustaining vegetative cover, meeting water quality standards, and minimising post-closure maintenance requirements.

The Peer Review Panel has described the Golden Cross operation as a world class mine closure.
Closure at Golden Cross focussed on the issues of handling site stormwater, compacting and sealing potentially acid generating waste rock, and creating long term stable structures. These objectives had been planned for both during initial planning and mine operation.

Buildings and equipment have been dismantled and removed. The mine's operational footprint has been recontoured to more closely resemble the surrounding landform.

Some administrative buildings remain. These will be used for recreational or educational or business use of the site. A range of partnership options is currently being investigated.

Major drainage channels have been constructed to handle runoff from a 1000-year rainfall event (715mm in two days).

The water treatment plant will continue to operate until all water on site meets discharge criteria and can be released into the Waitekauri River without any mechanical treatment. From this time the wetland areas will act as passive water treatment systems.



above left: The open pit has been capped, recontoured, and drainage channels added. above right: The rehabilitation process almost complete, 2001. The recontoured open pit can be seen in the foreground with the rehabilitated tailings dam in the background. The bush at bottom left is part of the Coromandel State Forest Park.

Potentially acid forming waste rock has been sealed and capped. The open pit has been contoured with low permeability mine overburden and revegetated. Drainage channels have been formed. The tailings impoundment has been partially capped and the perimeter revegetated. Drainage channels maintain the level of the freshwater pond.

Areas surrounding the minesite that had previously been cleared for farmland have been revegetated with native species. Bush areas adjacent to the Coromandel Forest Park have been fenced to exclude stock and provide a buffer zone.

A comprehensive monitoring programme keeps track of landform stability, vegetation rehabilitation, surface water quality, groundwater quality, and flora and fauna.
Final rehabilitation will have been completed when all consent conditions have been satisfied and the area has been returned to a self sustaining, stable landform.

Bonding provisions ensure that no ratepayer funds are required to successfully rehabilitate the site or cope with any future maintenance.



above: The tailings dam, summer 2001. Walking tracks, footbridges, and picnic facilities have been provided. Information panels along the tracks display the history of Golden Cross.



Conclusion


After another productive life the Golden Cross mine has closed for a second time. Within a short period of time little evidence will remain of the mine's successful second life. This very lack of evidence is part of the successful closure operation nearing completion as Coeur Gold redevelops a self-sustaining environment at the head of the Waitekauri Valley.

There will be other evidence, however: the sort modern gold mines like to leave behind.

Evidence of a productive partnership between the mine and the community.

Evidence of the stewardship role a modern gold mining company actively accepts.

And evidence of the commitment of the Coeur d'Alene Mines Corporation to Producing and Protecting.

It's what gold mining in New Zealand is all about.

And it's evidence that you really can get Green from Gold.