The Martabe project is seen as one of the more promising undeveloped mineral deposits in Asia, containing extensive proven reserves of gold and silver.
The Martabe Contract of Work (CoW) covers a 2,500km² area, the most significant part of which is the Purnama deposit.
It is a sulphidation epithermal deposit, which was discovered in 1997 through regional stream sediment sampling by Normandy Anglo Asia Ltd. Since then other deposits have also been discovered and resources at Martabe now stand at 6 million ounces of gold and 60 million ounces of silver.
Oxiana became the owner of the Martabe project through the acquisition of Agincourt Resources Limited in early 2007.
The Martabe project is located close to existing infrastructure and facilities and is bisected by the Trans-Sumatra highway. Supplies of grid power and process water are available, and the port of Sibolga is approximately 30km from the site.
Subject to approvals the Martabe project will move into construction in 2008 and then into production at the end of 2009.
GEOLOGY AND RESERVES

The most significant and best defined of these is the Purnama deposit, where a resource of 66.7 million tonnes containing 1.74g/t Au and 21.5g/t Ag for a total of 3.7 million ounces of gold and 46 million ounces of silver has been defined by diamond drilling.
Two adjacent deposits, Baskari and Pelangi, plus primary gold potential at depth and other virgin targets are expected to provide upside. Total resources are 6Moz of gold and 60Moz of silver. Reserves are 2.3Moz of gold and 30Moz of silver.
MINING

ORE PROCESSING
Oxiana expects to be treating 4.5 million tonnes of ore per annum using proven SAG and ball milling, and carbon-in-leach (CIL) technology. Recoveries are expected to average 76% for gold and 55% for silver.
Production on average will be 250,000oz of gold and approximately 2Moz of silver per annum over an initial nine-year production life.
Martabe's development cost has been put at $310m and mining cash costs are estimated at $270/oz. First production is expected to start in December 2009.
THE FUTURE
The potential to discover mineralisation elsewhere in the CoW area is considered high and exploration is ongoing at a number of other prospects. Two adjacent deposits, Baskari and Pelangi, plus primary gold potential at depth and other virgin targets are expected to provide upside.
A 5% interest is held in trust for local Indonesian stakeholders.