Wednesday, June 3, 2009

La Colosa Gold Mine, Colombia

The La Colosa porphyry gold project is located 150km west of Colombia’s capital city, Bogota, in the district of Tolima. La Colosa is the second major greenfield discovery in Colombia. AngloGold Ashanti explored in the site in 2006, followed by initial JORC-compliant resource estimates in May 2008.

Resource delineation drilling was undertaken during 2007 and by the end of the year around 12,000m of diamond drilling (in 42 drill hoes) had been completed.

The company announced an initial inferred resource of 468.8 million ounces at 0.86g/t gold totalling 12.9 million ounces.

The drilling and resource modelling at La Colosa is defined as a porphyry system with a grade of more than 0.3g/t Au extending over a strike length in excess of 1,500m. It has an inferred mineral resource of 381.4Mt at 1.00g/t Au for 12.3 million ounces of gold at a gold price of $1,000 per ounce and a lower cut-off of 0.3g/t Au.
"La Colosa is the first major gold porphyry discovery in the Andes."

Based on present drilling and geochemical observations, La Colosa’s mineralisation systems, along with the La Belgica sector, remain open to the north, south and east.

La Colosa is the first major gold porphyry discovery in the Andes and AngloGold Ashanti has first mover advantage with granted and application tenements covering an area of around 61,700km².

Drilling activities at La Colosa were suspended in late February 2008 due to environmental requirements. Subsequently, all the necessary documentation was submitted to the relevant authorities for approval. The drilling activities are expected to resume in April 2009.

During 2008, the mineral resources increased by 33.4 million ounces to 241.0 million. The project enabled company to add 12.9oz of gold to its resource base by the end of 2008.

Future output is estimated at 700,000oz of gold.


You can read completely at http://www.mining-technology.com

Monday, May 25, 2009

Kalgold Gold Mine, South Africa

Kalgold mine is an open pit operation owned by South Africa-based Harmony Gold Mining Company Limited. Located 60km south of the town of Mafikeng in the North West Province of South Africa, the mine includes a Carbon in Leach (CIL) plant.

Harmony acquired Kalgold in July 1999, and in November 2003 the group entered into an agreement to sell the mine to Afrikander Lease Limited. However, the contractual obligations were not met and subsequently the agreement was cancelled in March 2004.

Production disruptions at Kalgold

Water shortages followed by heavy rainfall and electric disruptions had a negative effect on production at Kalgold in 2007 and 2008, leading to a loss of production, which was compounded by numerous instances of plant breakdowns.

The disruptions caused 3% decline in the volumes milled at Kalgold in 2008. However, a significant improvement in the gold grade to 1.89 gram per tonne during the year helped Harmony to more than double its gold production from the mine.


Geological information

Operations at the Kalgold mine are located within the Kraaipan Greenstone Belt near Mafikeng town.

The belt is a part of the larger Amalia-Kraaipan Greenstone terrain. It comprises linear belts of Archaean meta-sedimentary and meta-volcanic rocks trending northwards and separated by granitoid units.

Shallow dipping quartz veins in the form of swarms or clusters within the steeply dipping magnetite-chert banded iron formation are found in the mineralisation.

The largest orebody encountered in the region is the D Zone, which has been mined extensively along a strike length of 1,300m within a single open pit operation. Mineralisation was also found in the A Zone; the Mielie Field, adjacent to the D Zone; A Zone West (along strike to the north of the D Zone); and the Watertank and Windmill areas to the north of the A Zone.

You Can Read Completely at "www.mining-technology.com"

Monday, January 19, 2009

Omagh Gold Project, United Kingdom


The Omagh gold project, situated in Crown Estate prospecting licence OM 1/03, covers an area of about 189km2, straddling the counties of Tyrone and Fermanagh in western Northern Ireland.

Omagh Minerals Ltd (OML), a wholly owned subsidiary of Canadian company Galantas Gold Corp, owns the freehold to the site as well as the prospecting and mining rights, planning consent and infrastructure.

Following the discovery and exploration of vein gold at Curraghinalt in the Sperrin Mountains by Ennex International in the mid-1980s, Riofinex North Ltd began exploration of the geological inlier known as Lack, named after a local village. Riofinex discovered the gold-bearing Kearney vein structure – the current focus of production – and the surrounding swarm of gold veins during the course of an exploration and resource delineation programme.

In 1990, the project was transferred to OML, which was acquired in 1997 by Ontario-based European Gold Resources. In 2004, the company was renamed Galantas – Gaelic for ‘elegant thing’.

The $20m project has been funded through a series of stock issues. The payback period is estimated at 2.7 years from July 2008.



Geology

The licence includes a 72km2, partly fault-bounded, Lack inlier of upper Proterozoic age and upper Dalradian metamorphic rocks, surrounded by lower Palaeozoic rocks. The Dalradian of the eastern half of the Lack inlier, where most of the exploration work has been done, consists mainly of a series of quartz-feldspar-muscovite-chlorite schists of varying composition.

Mineralisation within the structures consists of quartz veins up to a metre wide with disseminated to auriferous sulphides, predominantly pyrite and galena, with accessory arsenopyrite and chalcopyrite.



Resources

The mine consists of several veins of varying ore grades. May 2008 estimates put total measured and indicated resources at 104,000oz Au and inferred resources at 295,800oz Au. The resources are independently reported to CIM code and Canadian National Instrument 42-101 standard. Extraction of only two of the veins, of which Kearney is the largest, is expected to give a mine life of 4.6 years.



Production

The Kearney vein is being mined by open-pit methods. The rock is sufficiently naturally fractured that blasting is not required.

There are two types of overburden within the pit: peat and glacial till. Both are being stockpiled for use in later restoration. Below the till lies bedrock, both barren country material and mineralised gold resource. The ore is being mined using a narrow excavator bucket then taken to a nearby processing plant by dump truck.



Processing

The processing plant uses conventional crushing, grinding and flotation to produce a lead sulphide concentrate. The ore is crushed in three stages (two-stage for the smaller pieces) and ground with water in a ball mill to fine sand, about half of which is less than 75 microns. Some of the ground material is treated by gravity methods but most of it is mixed with water, foaming and flotation agents, then passed to froth flotation tanks. The foam is then taken from the top of the cell, cleaned and dewatered and the resultant concentrate packed for shipment and sale.

First concentrate was shipped in February 2007. Concentrate enhancement experimentation is taking place. Froth washing has so far proven more effective than use of a regrind circuit.

During 2007 Galantas processed ore containing 6.24g/t gold and achieved a recovery of 89%. This improved during the year such that, after May 2007, the average recovery was 90% and the average after November 2007 was 92%.

Recovery for January and February 2008, at 83g/t, was similar to the 2007 average but the average for March and April 2008 rose to 106g/t.

The concentrate is sold via an offtake agreement with Xstrata subsidiary Falconbridge, of Canada, while part of the recovered gold is designed and sold by Galantas Irish Gold through retail channels such as Galantas-branded 18ct gold jewellery.

Power is provided by a 1,000kVA genset, a 400kWA genset and an 80kVA genset, although not all are in use at any one time. Galantas anticipates that mains electricity will be provided in due course.

Tuesday, December 30, 2008

Olympic Dam Copper-Uranium Mine, Adelaide, Australia

The Olympic Dam copper-uranium mine and plant is situated in South Australia, 580km north-west of Adelaide. Opened in 1988, Olympic Dam is wholly owned and operated by WMC Resources, which discovered the deposit in 1975. A A$1,940m expansion programme was completed in 1999, raising its capacity to 200,000t/y of copper and 4,300t/y of uranium, plus gold and silver. In mid-2005, BHP Billiton gained control of WMC Resources in an A$9.2bn takeover.

In 2007 BHP Billiton announced that it would undertake a A$6bn–A$7bn expansion of the Olympic Dam mine. The company says that annual ore production will increase up to 70 million tonnes, a seven-fold increase if the expansion proceeds. Copper production will increase from approximately 180, 000t a year to approximately 730,000t.

This would include 500,000oz of gold, 500,000t of copper and 15,000t of yellowcake. Existing average gold production is 80,000oz pa. The additional proven reserves of uranium now make Olympic Dam one of the most promising uranium mines in the world.

Intierra's Minmet data base puts current Olympic Dam proven-probable reserves at 756 million tonnes grading 1.5% copper, 0.5kg/t U308, 0.5 g/t gold and 3.1g/t silver. The measured to inferred resources were 3.214 billion tonnes at 1.025% copper, 0.337kg/t U308, 0.442g/t gold and 2.144g/t silver. On these figures, without improved grades or increased tonnage, Olympic Dam has proven reserves of a contained 12.153Moz gold and contained resources of 45.62Moz.

The results of the study ended much speculation within the mining and investment communities, which were especially abuzz about the potential upgrade of gold reserves.

Once fully complete, the expansion would make Olympic Dam the biggest mine in the world. Concerns have naturally been voiced about how the necessary infrastructure will be funded and deployed. Finding skilled labour will be another challenge.

GEOLOGY AND RESERVES

The deposit occurs in the basement rocks of the Stuart Shelf geological province in the north of South Australia, west of Lake Torrens. Mineralisation consists of medium-grained chalcopyrite, bornite and chalcocite, fine-grained disseminated pitchblende, gold, silver and rare earth minerals that occur in a magnetic hydrothermal breccia complex beneath 350m of overburden. The ore occurs in distinct zones that determine the mine access and layout.

As of September 2008, the total ore reserves at Olympic Dam stood at 473Mt, up from 399Mt in 2007, grading 1.86% copper and 0.6kg/t U3O8..

MINING

The current scope and logistical demands of the mine will be increased by a few orders of magnitude once the expansion gets into full swing. The mine will gradually be transformed from an underground operation to open pit.

Three vertical shafts and a decline access the orebody, which is worked using a variation of sublevel open stoping. Each stope may contain 300,000t of ore. Drill drives are driven on the stope centre line and blastholes drilled in vertical rings. These are charged with ANFO and detonated with shock tube detonators. The drilling fleet comprises Atlas Copco and Tamrock production rigs, with development being carried out using two Tamrock (now Sandvik) jumbos. Atlas Copco has supplied two modified Simba H4356S production drilling rigs.

Stopes are backfilled with cemented aggregate of crushed 'mullock' (waste rock), deslimed mill tailings, cement and pulverised fuel ash (PFA). Automation has done much to reduce production costs at Olympic Dam. Innovations include the automated underground haulage system and the 'smart' loader, a robotics-driven, decision-making underground ore carrier.

ORE PROCESSING

Processing facilities consist of a copper concentrator, hydrometallurgical plant, copper smelter, sulphuric acid plant, copper and gold/silver refineries. Recent expansions included a Svedala autogenous mill, additions to the flotation sections, two counter-current decantation thickeners, an electric slag-cleaning furnace, a new anode furnace gas-cleaning plant and additional electro-refining cells.

Copper is recovered primarily by copper sulphide flotation from slurry before the copper concentrate is smelted and electro-refined to high-purity copper.

Wastes generated during electro-refining are treated to recover gold and silver. After treatment by flotation, the finely-crushed ore is leached with sulphuric acid to dissolve uranium and any remaining copper. The leach liquor is processed in the solvent extraction plant to separate the residual copper and uranium streams. Copper is recovered by electrowinning and uranium converted to yellowcake and calcined uranium oxide.

Installation of two pulsed columns has increased uranium recovery from solution from 90% to about 97%. These columns use an air pulse to mix the acidic and organic solutions, providing better contact for the chemical reaction involved in transferring the uranium from one to the other.

Copper cathode sheets are transported by truck within Australia and to Port Adelaide for export. All uranium oxide produced at Olympic Dam is exported. The gold plant became fully operational in 2000. A fire in 2002 at the solvent extraction / electrowinning plant cost over A$300m to repair, while WMC also spent A$127m on renovating the copper smelter during 2003.

EXPANSION

At the end of October 2008, BHP Billiton announced that it expects to complete the first of the mine's five-stage expansion by 2013, boosting annual production capacity to 200,000t of copper, 4,500t of uranium and 120,000oz of gold. Up to the end of the business year on 30 June 2008, Olympic Dam produced 169,000t of copper cathode, 4,144t of uranium and 80,517oz of gold.

The expansion will be followed by a staged development of an open pit, with an eventual target output of 730,000t of copper and 19,000t of uranium. The company also said it is looking at shipping copper concentrate directly to smelters in China, which will cut the cost of producing cathodes at the mine.

ENVIRONMENT

Olympic Dam maintains storage facilities for all waste products. The plant has been designed so that any spillage of ore, concentrate or process slurries can readily be returned to the process circuit. The plant also includes comprehensive air pollution control equipment and both air emissions and noise are monitored. Extensive radiation monitoring of personnel and the environment is ongoing.

The Australian and South Australian Governments jointly determined that the proposed Olympic Dam expansion must be formally assessed through an Environmental Impact Statement (EIS).

Tuesday, December 23, 2008

Sunrise Dam, Australia


The Sunrise Dam gold mine lies on the eastern shore of Lake Carey in the northern goldfields of Western Australia, some 770km north-east of Perth, 220km north/north-east of Kalgoorlie and 55km south of Laverton. It is 100% owned by AngloGold Ashanti.

Formerly just an open cut mine, the operation comprises of both a large open pit and an underground mine. Each commenced operations in 1997 and 2003 respectively.

The mine achieved record production of 600,000 oz for 2007, largely due to the GQ zone in the open pit. Just under 80,000 oz was sourced from the underground mine.


The conversion of the mine’s diesel power station to liquefied natural gas (LNG) went according to plan in 2007 and the new LNG facility will start operating in the second quarter of 2008. AngloGold says that this will lead to drastically reduced energy costs as well as reduced greenhouse emissions.

Capital expenditure for the year amounted to A$35m (US $30m), and was spent mostly on the underground operation. Major items of expenditure included capitalised underground development in the Cosmo lode and the Sunrise Shear Zone decline, as well as costs relating to the north wall cutback and the expansion of the village.

Some 360 people are employed at the mine, 255 of whom are contractors.



Geology and reserves

Gold ore at Sunrise Dam is structurally and lithologically controlled within gently dipping high-strain shear zones (for example, Sunrise Shear) and steeply dipping brittle-ductile low-strain shear zones (for example, Western Shear). Host rocks include andesitic volcanic rocks, volcanogenic sediments and magnetic shales.

Total ore reserves as of the end of 2007 were 552,000 oz (underground), 1.1m oz (open pit). Total mineral resources were 3.078 m oz Au.



Mining and processing

The mine comprises a large open pit, which is now in its 11th year of operation, and an underground mine, which began production in 2003. All the mining is carried out by contractors and ore is treated in a conventional gravity and carbon-in-leach (CIL) processing plant which is owner-managed.



Production and costs

Production for 2007 rose by an expected 29% to hit a record 600,000oz, compared to 465,000oz for 2006.


The GQ zone in the open pit provided the anticipated large volumes of high-grade ore, which accounted for the increase in annual gold production. Some 80,000oz of gold came from the underground mine. Progress was made in developing access to the Cosmo, Dolly and Watu lodes, and 2,000m of underground capital development and 6,100m of operational development were completed. A total of 67,400m of diamond drilling was also completed.

Processing plant throughput in 2007 was 3.8Mt, slightly lower than the record throughput of 3.9Mt in 2006. Total cash costs fell by 8% to A$364/oz (up by 3% in US dollar terms to $306/oz).

Despite rising costs, the greater volume of ore mined, and the high value of the Australian dollar, the increase in production, due primarily to the higher grade of ore mined, resulted in the decrease in cash costs, year-on-year.

Wednesday, December 17, 2008

Munali Nickel Project, Zambia

The Munali project sits about 60km south of Lusaka in southern Zambia. It is wholly owned by Australian company Albidon Ltd, and currently consists of two deposits – Enterprise, also known as Munali Phase 1, and Voyager. Although it is billed as a nickel project, Munali also contains commercial quantities of copper, cobalt and platinum group metals (PGMs).

Development began in September 2006 following a positive feasibility study and gaining the necessary government permits and approvals. Production of ore for the ten-year project started in March 2008, with first concentrate being processed for stockpiling in late June 2008.

The project is said to be one of very few new nickel sulphide developments planned worldwide in the next few years, and is expected to have a final direct cash operating cost of about US$3 per pound of nickel in concentrate.

Munali is costing $125m in capital and about $25m in working capital and mine development, and has been funded by a mix of debt financing and equity.

Up to $80m of senior debt has been provided by Barclays Capital and the European Investment Bank as joint lead arrangers for the project; the Jinchuan Group, of China, has provided an extra $20m in subordinated debt.

The equity funding consists of $40m raised from Albidon shareholders, $15m from the Jinchuan Group and $10m from ZCCM Investment Holdings plc. The Jinchuan Group has a life-of-mine offtake agreement with Albidon for Munali, and its share of the funding is part of the agreement.

Geology

The deposit is of the "gabbro-hosted" class of nickel sulphide deposits and, as such, the geology and style of mineralisation are broadly similar to that of other gabbro deposits such as Tati in Botswana and Sally Malay in Australia.

Albidon's geologists believe that the mineralisation is associated with mafic to ultramafic intrusions that have been emplaced along major regional faults, with the type example being the Munali Gabbro intruded along the Munali Fault.

Resources

The latest total indicated and inferred resources for the deposits, at a cut-off grade of 0.6% nickel, are 10.3Mt at 1.2% nickel, 0.2% copper, 0.07% cobalt, 0.6g/t palladium and 0.3g/t platinum. This amounts to a current metal inventory at Munali of 123,500t of Ni and 246,800oz of PGMs.

Production

Following an initial ramp-up period through 2008, annual production is scheduled to reach full capacity by early 2009, when it will consist of 10,000–10,500t of nickel, 1,650t of copper, more than 480t of cobalt and 18,000oz of PGM from the 1.2Mt/annum underground Enterprise mining operation.

The ore is processed through a conventional flotation concentrator that consists of a simple crushing and grinding circuit, rougher, scavenger and cleaner flotation cells, followed by concentrate and tailings thickeners. The end product is a nickel-copper-cobalt-PGM concentrate which is sold to Jinchuan Group for smelting. Albidon recorded its first revenue from the sale of Munali concentrate in October 2008.

The water supply for the project comes partly from an onsite borefield. Also, groundwater inflow into the mine is pumped to the surface storage system for use in the processing plant, and water used to pump tails to the tailing storage facility is returned back to the processing plant for reuse.

Albidon has agreed a ten-year power supply deal with Zambian utility Zesco, in which a 25km, 33kV overhead power line has been built from the hydroelectric substation in Kafue. The average running load for the plant and the mine is estimated at 5MVA.

The principal mining contractor was Byrnecut Mining International Ltd, of Australia.

Tuesday, December 9, 2008

Blue Ridge PGE Project, South Africa

Ridge Mining's Blue Ridge project is situated on the Blaauwbank farm, about 30km south-east of Groblersdal, on the eastern limb of the Bushveld Igneous Complex (BIC), South Africa.

Ridge Mining started exploration work on the project in 2001 and completed a feasibility study at the end of 2005. Mine development, estimated to cost $170m, began in January 2007.

The project is a 50:50 joint venture between Ridge Mining and BEE partner Imbani, which had invested more than $100m of equity by December 2008. In December 2007, project finance agreements were signed with a consortium of banks consisting of the Development Bank of Southern Africa, the Industrial Development Corporation of South Africa, Standard Bank and Investec Bank for R715m, giving full finance through to first production, which is set for the end of 2008.

The cash operating cost assumption for Blue Ridge is $660/oz to produce platinum, palladium, rhodium and gold, giving an expected payback period of five years.

Geology

The eastern limb of the BIC, like the rest of the complex, consists of distinct rock strata, including three PGE-bearing layers known as reefs, with one being the UG2 chromitite reef.

The PGEs in the UG2 chromitite occur primarily in discrete mineral phases, varying from sulphide assemblages (predominantly cooperite, braggite, malanite and laurite) to those consisting of a significant component of alloys (such as Pt-Fe alloy) or various telluride, bismuthinide, bismuthotelluride, arsenide and sulpharsenide phases.

Resources

Total Measured, Indicated and Inferred resources are put at 89.9Mt, which includes 38.7Mt of Indicated resources from the neighbouring Millennium area, acquired by Ridge in March 2008, giving a contained 4PGE figure of 9.2Moz at an average grade of 3.2g/t. Total Proved and Probable reserves are nearly 22Mt to give a contained 4PGE figure of nearly 2.3Moz at 3.3g/t.

Production

The mine development is based on two decline shafts; a 700m-long belt decline, which will be used for transporting ore, and an 850m-long truck decline. During 2008 work focused on opening up production levels and faces in readiness for mining to begin in earnest. The plan is to mine only the higher grade portion of the reef, using a method called "Efficient Cut".

Before the plant was commissioned, Ridge Mining stockpiled more than 200,000t of ore – about two months’ worth of throughput for the plant in full production – allowing enough ore to be processed through the concentrator plant while the underground workings continue the ramp-up to full capacity, which is planned for the middle of 2009.

Annually the mine is forecast to produce about 75,000oz of platinum, 35,000oz of palladium, 22,000oz of ruthenium, 13,000oz of rhodium, 2,500oz of iridium and 1,500oz of gold over its initial 18-year life.

Processing

The ore will be processed using crushing, milling and flotation, then milling and flotation again to produce a concentrate. The ore will be fed through a primary ball mill and into primary roughers and cleaners, from where some of the feed will go to a care thickener and the rest to a secondary ball mill and roughers and cleaners, then on to tails thickeners. The concentrator plant is next to the entrance to the main decline shaft, which has a conveyor belt to bring the ore to the surface. Processing testwork show recoveries into concentrate of 82%-86%.

Once the mine has achieved steady-state production, Ridge Mining plans to boost its performance by re-treating the tailings and processing ore from Millennium, which it acquired from Lonmin in March 2008 for an undisclosed amount. Millennium has raised the original resources at Blue Ridge by more than 70% and allows the company to mine at a higher rate because it gives a greater strike length. An offtake agreement has been signed with Impala Refining Services for all the production from the mine.

Water will come from a combination of boreholes and the nearby Loskop Dam.

For electrical power, Ridge Mining signed up with state utility Eskom before the moratorium on new supply contracts. The first power line, which will supply about 70% of the mine’s requirements of 17MVA at full production, was installed in November 2008, with the rest due in 2009. To cater for any shortfall in the interim and for any unforeseen outages, however, Ridge Mining has back-up diesel generators that can provide all the mine’s power, albeit at higher cost.

The process plant, which will be operated by Minopex, was built by Bateman Engineering; Murray & Roberts Cementation are responsible for the underground mine development.

Wednesday, December 3, 2008

Boddington Gold Mine, Perth, Australia


The Boddington Gold Mine (BGM) is about 130km south-east of Perth in Western Australia. The largest undeveloped gold mine in the country, it is poised to become the highest producing mine once production ramps up over the next few years.

The $2.4bn project was initially a three-way joint venture between Newmont Mining, AngloGold Ashanti and Newcrest Mining. In 2006 Newmont bought Newcrest’s 22.22% share, bringing its interest to 66.67% and ending any Australian ownership. AngloGold owns the remaining 33.33%.
The original, mainly oxide open-pit mine was closed at the end of 2001.

Recent exploration has identified an extensive 19.57Moz gold bedrock resource, the basis of the Boddington Gold Mine Expansion Project. Approved in 2006, this will involve mining the hard gold/copper ore that lies beneath depleted oxide pits at Boddington’s original mine site.

The project has an attributable capital budget of between A$0.8bn and A$0.9bn. At year-end, the overall project was approximately 65% complete, with engineering and procurement activities nearing completion. Construction of the treatment plant was approximately 32% complete. At its peak the project is expected to employ some 2,000 workers. Once production begins it is expected that around 650 full-time staff will be required.

Based on the current plan, mine life is estimated to be more than 20 years, with attributable life-of-mine gold production expected to be greater than 5.7Moz.

Newmont and Anglo have focussed their exploration activities on the poorly explored areas of the greenstone belt outside the already identified Boddington Expansion resource. The exploration strategy is to identify the resource potential of the remainder of the greenstone belt, with the emphasis on high-grade lode-type deposits.


Geology and reserves

The BGM is located within the Saddleback Greenstone Belt (SGB), a fault-bounded sliver of Archaean volcanic and shallow level intrusive rocks, surrounded by granitic and gneissic rocks. The SGB produced over 6Moz of gold and is a highly prospective exploration area for further gold mineralisation in both large tonnage stock-work gold resources and high-grade lode-type gold resources.

As of the end of 2007, proven ore reserves at Boddington were 1.618Moz. Total mineral resources (measured, indicated and inferred) were 10.3Moz.


Mining

Built on the footprint of the original Boddington Gold Mine, the operation involves open cut mining from two large pits and is expected to produce an average 850,000oz of gold and 30,000t of copper a year for more than 20 years.

Production is due to commence in late 2008/early 2009 under the management of the Boddington Gold Mine Management Company, a 100% Newmont-owned company.


Production

Average attributable gold production in the first five years will be between 320,000oz and 350,000oz a year, while on an average life-of-mine basis, attributable production is estimated to be between 250,000oz and 270,000oz a year. Copper production, which will be sold as concentrate, is expected to be around 30,000t per year.

Monday, December 1, 2008

Cripple Creek and Victor, Gold Mine, Colorado Springs, USA





The Cripple Creek and Victor gold mine (CC&V) lies southwest of Colorado Springs in the US state of Colorado. For many years the Cripple Creek Mining District was a series of underground mines. Following the start in 1994 of the CC&V Cresson Project today it is a low-grade, open-pit operation.

In March 1999 AngloGold Ashanti acquired the Pikes Peak Mining Company, and interests in the Cripple Creek & Victor Gold Mining Company (CC&V) and the Jerritt Canyon Joint Venture. The stake in the Jerritt Canyon Joint Venture was sold to Queenstake in mid-2003.

Up until mid-2008 the CC&V mine was a joint venture two-thirds owned by AngloGold Ashanti with Golden Cycle Gold Corporation owning the balance. In mid-2008 AngloGold completed a full acquisition of Golden Cycle which resulted in its taking 100% ownership of the CC&V mine.

Development drilling, engineering analysis and permitting requirements for the mine life extension project are under review. The proposed extension is to include the development of new sources of ore and an extension to the additional heap-leach facility.

AngloGold says that gold production at CC&V will increase to between 290,000oz and 300,000oz for 2008 at a total cash cost of between $298/oz and $308/oz. Operational initiatives have been taken to minimise growth in the leach-pad gold inventory in 2008.

Capital expenditure of $28m is scheduled for 2008, to be spent mostly on major mine equipment purchases and the mine life extension project. The mine currently employees 338 full-time workers and 67 contractors.

In 2007 investigators revealed that a gang of employees had stolen some $3m-worth of gold from the mine since 1999. A number of former staff are now serving time in prison.


Geology and reserves

The Cripple Creek mining district is centred on an intensely altered alkaline, tertiary-aged, diatreme-volcanic, intrusive complex, approximately circular in shape, covering 18.4km2, and surrounded by Precambrian rocks. The rocks consist of biotite gneiss, granodiorite, quartz monzonite and granite.

The intersection of these four units and regional tectonic events formed an area of regional dilation which subsequently localised the formation of the tertiary-aged volcanic complex.

Higher-grade pods of mineralisation occur at structural intersections and/or as sheeted vein zones along zones of strike deflection. High-grade gold mineralisation is associated with K-feldspar + pyrite +/- carbonate alteration and occurs adjacent to the major structural and intrusive dyke zones. The broader zones of disseminated mineralisation occur primarily as micro-fracture halos around the stronger alteration zones in the more permeable Cripple Creek Breccia wall rocks.

The average depth of oxidation is 120m and is also developed along major structural zones to even greater depths. Individual orebodies can be tabular, pipe-like, irregular or massive. Individual gold particles are generally less than 20 microns in size and occur as broad zones of low-grade gold-pyrite mineralisation or as fracture zones containing high-grade gold-silver tellurides. Gold occurs within hydrous iron and manganese oxides and as gold-silver tellurides. Silver is present but is economically unimportant. Gold mineralisation can be encapsulated by iron and manganese oxides, pyrite, K-feldspar alteration and quartz.

Proven ore reserves as at December 2007 were 118,904t at a grade of 0.028. Total mineral resources (measured, indicated and inferred) were 494,124t.


Mining and processing

Up until the 1960s The Cripple Creek Mining District was mined initially by multiple underground operations until the 1960s, after which mining activities ceased for a period. Small scale surface mining started in the 1970s until the start of large-scale surface mining in 1991, leading eventually to the start in 1994 of the CC&V Cresson Project. Today, CC&V is a low-grade, open-pit operation.




Ore processing

The ore is treated using a valley-type, heap-leach process with activated carbon used to recover the gold. The resulting doré buttons are shipped to a refinery for final processing.


Production add costs

Production at CC&V fell slightly in 2007 to 282,000oz from 283,000oz in 2006. A total of 23Mt was placed on the heap-leach pad.

AngloGold attributed the production decline to the greater distance over which the gold-bearing leach solution had to be transported from the higher stacked ore to the leach-pad liner. This decline was compounded in the third quarter by delayed production from the leach-pad stacking levels.

There was an 8% increase in cash costs for 2007 to $269/oz from $248/oz in 2006, due in larger part to higher commodity prices, especially diesel fuel. This more than absorbed savings arising from lower contractor costs, while creeping inflation in the US economy added to the burden.

The higher gold price received throughout 2007 contributed to a 222% increase in adjusted gross profit to $74m. Capital expenditure for the year amounted to $23m (2006: $13m).

Thursday, November 27, 2008

Highland Valley Copper Mine, British Columbia, Canada


Highland Valley copper/molybdenum mine is located 75km southwest of Kamloops, British Columbia, Canada. The Valley pit has yielded more than 1,100Mt of ore in its lifetime.

Highland Valley Copper was created as a partnership between Rio Algom and Cominco in 1986 to combine the Bethlehem and Lornex mines. Following the merger between Teck and Cominco in 2001, the 2000 takeover of Rio Algom by Billiton and Billiton's subsequent merger with BHP, the mine was then majority owned by Teck Cominco (63.9%) and BHP Billiton (33.6%). At the beginning of 2004, Teck Cominco exercised its pre-emptive rights over BHP Billiton's holding when the latter put it up for sale, and is now 97.5% owner of Highland Valley.

Production at the mine has decreased significantly the last few years due to an increased reliance on the lower-grade Lornex pit in line with a $C300m mine expansion project designed to push its life expectancy out to 2019. All of the mining equipment required for this work is now on site and commissioned. Highland Valley’s total copper production for 2007 was 136,000 tons, compared to 167,000 tons for the previous year. Molybdenem was just under 4 million pounds compared with just over 4 million for 2006.


Geology and reserves

Highland Valley is a low-grade (0.4% Cu) porphyry copper-molybdenum deposit associated with the younger intrusive phases of the early to mid-jurassic, calc-alkaline Guichon Creek batholith.

As of the end of 2005, proven and probable ore reserves totalled 318Mt grading 0.43% copper and 0.008% molybdenum. Mineral resources added a further 151.9Mt at 0.37% copper and 0.005% moly.

Reserves have been drill defined at 60 to 115 metre centres and resources at 125 metre centres. In 2007, a positive geotechnical study at Lornex added 197 million tons of indicated resource at a US$1.65/lb copper price and US$9.50/lb molybdenum price.


Open-pit mining

Open-pit mining is used in both the Lornex and Valley pits, with around 90% of the ore coming from the Valley pit. Three computerised Bucyrus 49R drills prepare blast hole patterns while nine P&H 4100A 37 yd³ electric shovels load ore into a fleet of Komatsu haul trucks for transport to in-pit crushers. In 2001, eight of the 170t-capacity trucks were replaced by six new 215t haulers. Further support is given by three water trucks, eight road graders, eight tracked bulldozers, three rubber-tyred bulldozers and one front-end loader.

The mine uses two semi-mobile in-pit crushers to minimise haul distances. Several kilometres of conveyors carry up to 12,000t/h of crushed ore to three stockpiles at the Highland mill. Pit operations are monitored and controlled by a Modular Mining Systems computerised dispatch system designed to maximise mine production. In addition minute-by-minute mapping is achieved by combining GPS navigation and survey with GIS mapping techniques.


Ore processing

The Highland mill, the world’s third largest copper concentrator, was constructed in the late 1980s by combining the original Lornex and Highmont mills. The complete Highmont mill was moved by road 10km from its former site to a new position adjacent to the Lornex plant.

The crushed ore enters two grinding stages in five parallel grinding lines incorporating two fully-autogenous mills, and three semi-autogenous (SAG) mills grinding a total of 5,400t/h. The second stage consists of eight ball mills reducing ore to sand-sized particles which feed the flotation circuits. The primary flotation stage extracts copper and molybdenum from the slurry before copper and molybdenum are separated. The molybdenum concentrate is mixed with a leaching brine in sealed, pressurised, heated vessels where residual copper is dissolved, leaving a high-grade molybdenum concentrate. Lastly, the copper and molybdenum concentrates are filtered and dried in gas-fired driers for shipping. Three 1m-diameter pipelines take the tailings 7km overland from the mill to the Valley tailings pond.


Concentrate transport

Copper concentrate is transported in bulk 40km to the rail yard at Ashcroft, then by rail to north Vancouver and finally by ship to overseas smelters. The molybdenum concentrate is packaged on site for shipment.




Environment

In 1997, Highland Valley Copper was presented with the 1996 British Columbia Reclamation Citation Award in the metal mining category for its outstanding achievement in reclaiming 1,000ha and planting 700,000 native trees and shrubs. Work to establish fish stocks in different water bodies on the property is continuing to be successful.



Production

As noted in the overview above, production at Highland Valley has declined significantly the last few years. Teck Cominco recently downgraded its production guidance for the 2008 full year from an initial 122,000 tons to 113,000 tons. Highland Valley’s total copper production for 2007 was 136,000 tons, compared to 167,000 tons for the previous year. Molybdenem was just under 4 million pounds compared with just over 4 million for 2006. Total ore mined fell also to 42.6Mt.
Teck Cominco has stated that mining of areas with higher clay content will continue throughout 2008 and 2009. Just over half of the total ore mined for Q3 2008 came from the lower grade Lornex mine compared with only 41% for the 5% to 30,500 tons.


The future

Waste stripping for Highland Valley's $C300m mine life extension is continuing with the pushback of the east wall in the Valley pit progressing well despite a minor geotechnical failure in the third quarter which is currently being rectified.

All the equipment is on site, permits received and contractors arranged. The pushback of the west wall necessary to extend the mine life to 2019 is scheduled to commence in early 2009 after the mine permit amendment received.

Wednesday, November 26, 2008

Ezulwini Uranium and Gold Mine, South Africa


The Ezulwini project involves the recommissioning of an underground uranium and gold mining operation located about 40km southwest of Johannesburg, on the outskirts of the town of Westonaria in Gauteng Province, South Africa. The mine is currently operating on a care and maintenance basis.

The mine was built in the 1960s and eventually reached production of 200,000tpm. In 2001, production at Ezulwini was halted primarily because of capital constraints compounded by weak gold and uranium prices.

The US$280m project is wholly owned by First Uranium through its local subsidiary Ezulwini Mining Company (Proprietary) Ltd. Existing infrastructure at the site includes two shaft headframes and four hoists, fans, compressors, generators, and underground equipment, as well as the necessary surface freehold required to operate the mine.

The capital expenditure for the project has been raised in three ways: through an IPO in December 2006, a convertible debenture in May 2007 and through proceeds from initial production. Payback is calculated at 5.2 years.


Geology

The project lies within the Witwatersrand Basin, an Archean (about 2.7 billion year-old) sedimentary basin that contains a stratigraphic sequence about 6km thick which consists mainly of quartzites and shales with minor intermittent volcanic units. Gold is hosted by the Upper Elsburg and Middle Elsburg Reefs underlying the mine. Uranium is found only in the Middle Elsburg Reef.


Mineralisation

Gold in the Upper Elsburg is found in the form of native gold and is associated with sulphide minerals, especially various forms of pyrite. Historically, 30-40% of the gold has been recovered by gravity processes, suggesting a high nugget effect.

In the Middle Elsburg Reef, gold is most commonly associated with pyrite, although some gold occurs in small blebs in arsenopyrite and cobaltite. Uranium is found in the form of uraninite. Mineralisation in the Middle Elsburg Reef has less of a nugget effect than the Upper Elsburg Reef.


Resources

At May 2007, there were no mineral reserves as defined by NI 43-101; the total Measured, Indicated and Inferred resources are put at just over 200Mt of about 32Moz contained gold and about 218 million pounds of contained U3O8. Reserves figures and revised resources estimates are expected in mid-2009.


Development

Part of First Uranium’s plans for developing the Ezulwini project has been to rehabilitate and re-engineer the main mine shaft by installing a floating steel tower, de-stressing the area where the shaft pillar intersects the shaft barrel, and building the uranium and gold processing facilities.

The company believes the rectification programme will enable the project to reach a production output of about 130,000 tpm by 2009 and 180,000 tpm by 2012, as the Upper Elsburg shaft pillar is developed and the Middle Elsburg uranium and gold section stopes are opened and expanded.


Production
The project is a conventional underground mine with breasting of the Upper and Middle Elsburg reefs. The ore is broken in the stopes and moved by slushers for loading into rail cars for transportation to the shaft. From the shaft and through the balance of the handling, the gold ores and the gold/uranium ores are kept separate. The ores are then hoisted to the surface for processing.

Ezulwini began gold production in July 2008, with uranium recovery starting in October 2008. Gold production is put at about 288,000 ounces a year while the average U3O8 production is expected to reach 2.1 million pounds a year. Full production will be attained in the fourth year and the mine has an expected life of about 19 years.


Processing

The choice of process is based on those previously used on the site. The ore is crushed and ground, then subjected to gold recovery by gravity and cyanidation. The uranium will be extracted by hot acidic leaching followed by solvent extraction and precipitation to form a concentrate (yellowcake). The uranium tailings will then be leached for gold recovery. Leaching will occur in a carbon in leach (CIL) process, after which gold will be electrowon and refined into doré bars.

Based on previous operating history, recovery rates of 95.5% for gold and 80% for U3O8 are expected.

Water comes from dewatering the mine, which the company says more than meets its needs.

Power comes partly from South African utility Eskom. In June 2008, Eskom agreed to increase its power commitment to Ezulwini from 40MW to 55MW. But in January 2008, Eskom had said it could not guarantee power supplies, so by July 2008, agreements had been finalised to obtain 10MW diesel generators to supplement the power from Eskom, and secure a steady supply of owner-generated electrical power with a total capacity of 24MW, inclusive of 14MW of existing standby units at the mine.

In September, First Uranium struck an exclusive deal with the Traxys Group to market all Ezulwini uranium.

The EPCM contractor for the project is MDM Engineering, of South Africa. The value of the contract is about US$200m.

TauTona, Anglo Gold, South Africa



In 2006 AngloGold Ashanti commenced a project to extend its South African TauTona gold mine to 3.9km. This was completed in 2008 making it the world’s deepest mine, surpassing the 3,585m deep East Rand Mine by a good distance. The name TauTona means "great lion" in the Setswana language.

The TauTona mine exists within the West Witts area not so far from Johannesburg in South Africa, near the town of Carletonville. TauTona neighbours the Mponeng and Savukamines, and TauTona and Savuka share processing facilities. All three are owned by AngloGold Ashanti.

Production at TauTona fell to 409,000 ounces in 2007, down from 474,000 ounces in 2006, due to increased seismic activity.

This required a review of the practice of mining of shaft pillars and high-grade remnants, and delays to the build-up in volume caused by opening up of the sequential grid. Capital expenditure in Siguiri was R2.5bn ($US71m) in 2007, with 56% committed to the development of ore reserve.

TauTona accounted for 7% of AngloGold Ashanti’s total 2007 gold production.

The mine was originally built by the Anglo American Corporationwith its 2km deep main shaft being sunk in 1957, with operations starting in 1962.

Since its construction two secondary shafts have been added bringing the mine to its current depth. The mine today has some 800km of tunnels and employs some 5600 miners. It is an extremely dangerous environment, with five workers losing their lives in 2007.

The mine is so deep that temperatures in the mine can rise to dangerous levels. Air conditioning equipment is used to cool the mine from 55°C down to a more tolerable 28°C. The rock face temperature currently reaches 60°C.

The journey to the rock face can take one hour from surface level. The lift cage that transports the workers from the surface to the bottom travels at 16 meters a second. The mine has also been featured on the MegaStructures programme produced by National Geographic.


Geology and reserves

The TauTona mine exists within the West Witts area slightly South West of Johannesburg in the North West of South Africa.

Two reef horizons are exploited at the West Wits operations: the Ventersdorp Contact Reef (VCR), located at the top of the Central Rand Group, and the Carbon Leader Reef (CLR) near the base. Owing to nonconformity in the VCR, the separation between the two reefs increases from east to west, from 400m to 900m. TauTona and Savuka exploit both reefs while Mponeng only mines the VCR. The structure is relatively simple with rare instances of faults greater than 70m.

The CLR consists of one or more conglomerate units and varies from several centimetres to more than 3m in thickness. Regionally, the VCR dips at approximately 21°, but may vary between 5° and 50°, accompanied by changes in thickness of the conglomerate units. Where the conglomerate has the attitude of the regional dip, it tends to be thick, well-developed and accompanied by higher gold accumulations.

Where the attitude departs significantly from the regional dip, the reef is thin, varying from several centimetres to more than 3m in thickness.

Total resources 2,615,000 ounces Measured resources 510,000 ounces Indicated resources 8,106,000 ounces


Mining and processing

Mining operations are conducted at depths ranging from 1.8km down to 3.9km following the recent expansion.

The mine consists of a main shaft system supported by secondary and tertiary shafts. The main mining method is longwall. TauTona shares a processing plant with Savuka. The plant uses conventional milling to crush the ore and a CIP (carbon in plant) to further treat the ore. Once the carbon has been added to the ore, it is transported to the plant at Mponeng for electro-winning, smelting and the final recovery of the gold.


Production

Gold production declined by 14% to 12,714kg (409,000oz) (2006: 14,736kg (474,000oz)), owing to a higher-than-expected fall in the volumes of ore mined. This was due to increased seismic activity in the vicinity of the CLR shaft pillar which is being mined, and at several highgrade production panels, where production was halted for limited periods during the course of the year. Both face length and face advance were negatively affected by seismicity during the year. The increased geological risk from this seismic activity necessitated re-planning regarding mine layout and mining methods.

Worsley Alumina Refinery, Australia


The Worsley Alumina Refinery is named after the historic timber settlement of Worsley, near Collie in the south west corner of Western Australia. The history of the project goes back to the early 1960s when a group of local entrepreneurs formed a firm to explore, develop and sell deposits of bauxite ore on the eastern side of the Darling Range, near Boddington.

Construction of a mine site and refinery began in 1980 and the first alumina was produced in April 1984. These days Worsley Alumina is a joint-venture partnership between BHP Billiton (86%), Japan Alumina Associates (Australia) (10%) and Sojitz Alumina (4%).

In May 2000, Worsley completed a $1bn expansion increasing annual production to 3.1 million tons.

The Worsley Alumina Development Capital Project (DCP), which commenced in 2004, was completed in 2007 at a cost of US$ 235m (US$ 188m our share), resulting in a 0.25 mtpa increase in alumina production (0.215 mtpa our share) to 3.5 mtpa.

In 2008 the partners announced a US$ 2.21bn ‘Efficiency & Growth’ expansion project at Worsley Alumina. This includes approximately US$ 70m of sustaining capital.

BHP says that the expansion project will lift capacity of the Worsley refinery from 3.5 million tons per annum (Mtpa) of alumina to 4.6 Mtpa (100% capacity) through expanded mining operations, additional refinery capacity and upgraded port facilities. Production is expected to commence in the first half of calendar year 2011. Worsley is currently the world’s fifth biggest bauxite mine.

BHP Billiton Aluminium President Jon Dudas said, "Worsley is one of the largest, lowest cost and most efficient alumina refineries in the world. This decision to invest in further production capacity underlines our confidence in the future of the alumina market. It also reflects our confidence in Worsley Alumina's ability to continue its excellent track record of production growth."

Alumina is carted by rail and exported through the Port of Bunbury. More than 1200 people are employed at the mine site and refinery. Many more jobs have been created through the employment of sub-contractors and through the support of local businesses and suppliers.


Geology and reserves

The Bunbury basalt has been dated at 135 and 128 Ma and overlies an erosional surface, thus marking the breakup of unconformity and volcanism in South Western Australia. It has been traced in the subsurface southwards and also offshore to the North East. Seismic evidence under the continental shelf between Perth and Bunbury shows that the Basalt flowed down an odd valley incising the continental margin. The Worsley mine has estimated reserves of 400mt.


Mining

Bauxite is mined from reserves mainly within State forest on the eastern edge of the Darling Range, near Boddington. The bauxite is crushed and carried 51km by a two-flight cable belt conveyor system to the refinery site at Worsley. It is then processed, and the separated alumina is carted by rail and exported through the Port of Bunbury.



Ore processing

The Worsley alumina refinery uses the Bayer process to produce metallurgical grade alumina, which is used as feedstock for aluminium smelting. Power and steam needed for the refinery are provided by a joint venture-owned onsite coal power station and a non-joint venture-owned on-site gas fired steam power generation plant.


Production

The partners have stated that the US$ 2.21bn ‘Efficiency & Growth’ project at Worsley Alumina will lift capacity of the Worsley refinery from 3.5 million tons per annum (Mtpa) of alumina to 4.6 Mtpa (100% capacity) through expanded mining operations, additional refinery capacity and upgraded port facilities.

Monday, November 24, 2008

Martabe, North Sumatra, Indonesia


Following review of the recently completed Definitive Feasibility Study (DFS), Oxiana's Board approved development of the Martabe gold and silver project in December 2007. The Board approval is subject to the receipt of final permits from the Government of Indonesia, which are expected by April 2008.

The Martabe project is seen as one of the more promising undeveloped mineral deposits in Asia, containing extensive proven reserves of gold and silver.

The Martabe Contract of Work (CoW) covers a 2,500km² area, the most significant part of which is the Purnama deposit.

It is a sulphidation epithermal deposit, which was discovered in 1997 through regional stream sediment sampling by Normandy Anglo Asia Ltd. Since then other deposits have also been discovered and resources at Martabe now stand at 6 million ounces of gold and 60 million ounces of silver.

Oxiana became the owner of the Martabe project through the acquisition of Agincourt Resources Limited in early 2007.

The Martabe project is located close to existing infrastructure and facilities and is bisected by the Trans-Sumatra highway. Supplies of grid power and process water are available, and the port of Sibolga is approximately 30km from the site.

Subject to approvals the Martabe project will move into construction in 2008 and then into production at the end of 2009.


GEOLOGY AND RESERVES

Martabe's high sulphidation gold deposits exist within a sequence of tertiary volcanic and sedimentary rocks near a fault splay which is part of the Great Sumatran Fault complex. Episodic fault activity has been responsible for pulses of high-level magmatism and development of multi-stage phreatomagmatic breccias, flow dome complexes, hydrothermal alteration and gold mineralisation observed in the district. Gold mineralisation occurs in a number of deposits over a strike length of 7km.

The most significant and best defined of these is the Purnama deposit, where a resource of 66.7 million tonnes containing 1.74g/t Au and 21.5g/t Ag for a total of 3.7 million ounces of gold and 46 million ounces of silver has been defined by diamond drilling.

Two adjacent deposits, Baskari and Pelangi, plus primary gold potential at depth and other virgin targets are expected to provide upside. Total resources are 6Moz of gold and 60Moz of silver. Reserves are 2.3Moz of gold and 30Moz of silver.


MINING

Mining of the Purnama deposit will be undertaken by conventional open-pit methods with a low average strip ratio of 0.7:1. The processing plant will be a large-scale ore processing plant. The plant and infrastructure will be designed to allow for future expansion.




ORE PROCESSING

Oxiana expects to be treating 4.5 million tonnes of ore per annum using proven SAG and ball milling, and carbon-in-leach (CIL) technology. Recoveries are expected to average 76% for gold and 55% for silver.

Production on average will be 250,000oz of gold and approximately 2Moz of silver per annum over an initial nine-year production life.

Martabe's development cost has been put at $310m and mining cash costs are estimated at $270/oz. First production is expected to start in December 2009.


THE FUTURE

The potential to discover mineralisation elsewhere in the CoW area is considered high and exploration is ongoing at a number of other prospects. Two adjacent deposits, Baskari and Pelangi, plus primary gold potential at depth and other virgin targets are expected to provide upside.

A 5% interest is held in trust for local Indonesian stakeholders.

Kaltim Prima Coal Mine, Indonesia


Kaltim Prima, one of the new generation of Indonesian thermal coal producers, is located in north-eastern Kalimantan. It is operated by PT Kaltim Prima Coal (KPC), which from the project's inception up to late 2003 was jointly owned by BP and Rio Tinto. The Indonesian government receives a royalty equivalent to 13.5% of the revenue. The operation is self-contained and employs some 2,700 people.

Although BP and Rio Tinto's Contract of Work required the companies to divest part of their holding to local interests, up until 2003 no Indonesian purchaser was able to raise the finance needed to buy them out.

In mid-2003, the companies announced the sale of their holdings in KPC to PT Bumi Resources for a cash price of $500m, including assumed debt. PT Bumi Resources already owned PT Arutmin Indonesia, another major Indonesian coal producer, and has interests in oil, natural gas and mining, amongst other commercial sectors.

In 2006, PT Bumi announced the sale of all its coal holdings to PT Borneo Lumbung Energi for $3.2bn. However, the deal subsequently failed, although PT Bumi later indicated that it still intends to divest a proportion of its holdings.


PROJECT DEVELOPMENT

BP and CRA (now Rio Tinto) successfully tendered for a 7,900km² licence area in eastern Kalimantan in 1978. Exploration from 1982–86 indicated reserves of 112Mt of export-quality thermal coal. Construction began in 1989 and the mine was commissioned in 1991 as a 7Mt/y operation at a cost of $570m.

The mine has subsequently been expanded, with a sales target of 20Mt/yr by 2005. PT Bumi is planning further expansion to 30Mt/yr, plus the development of the Bengalon reserve, some 25km from the existing Sangatta operations.

In mid-2004, PT Bumi awarded the Australian contractor, Henry Walker Eltin, a $1.2bn, ten-year contract for infrastructure development and mining services at Bengalon, which will have a 6Mt/yr initial capacity.


GEOLOGY AND COAL QUALITY

Pressure and heat associated with an igneous intrusion has increased the rank at Kaltim Prima to high-volatile bituminous coal. A total of 13 seams range in thickness from 1m to 15m; typically in the range of 2.4m to 6.5m. Seam dips vary from 3° to 20° at the outcrop. The seams are very clean in terms of mineral matter and sulphur and, at 4–8% in some areas, the in-situ moisture content is low.

As of the end of 2005, PT Bumi cited reserves at Sangatta at 621Mt, plus 165Mt at Bengalon. The company also has measured and indicated resources of some 3,700Mt.

As of mid-2004, PT Bumi cited reserves at Sangatta at 462Mt, plus 157Mt at Bengalon. The company also has measured and indicated resources of some 2,200Mt.

The operation produces two main export products. Prima Coal is a high-volatile bituminous steam coal with high calorific value, very low ash, low sulphur and low total moisture. Pinang Coal is similar but has a higher moisture content. Quality parameters are:

Product ***********PrimaCoal **********Pinang Coal


Moisture (total) *******9.5% ***************14%
Ash ***************** 4% ******************6%
Volatiles **************39%*************** 39%
Fixed carbon********** 52% ***************46%
Total sulphur********* 0.5% **************0.5%
Heating value (adb) **30.1MJ/kg ********27.6MJ/kg
Heating value (gar) **28.5MJ/kg *********26.0MJ/kg

adb = air-dried basis
gar = gross, as received
KPC blends run-of-mine coal from its various pits to ensure product consistency.

As of end-2001, Kaltim Prima had mineable reserves totalling 462Mt, plus measured and indicated resources of nearly 2,200Mt.


MINING TECHNOLOGY

KPC operates six to 12 individual open pits at any time, the average stripping ratio being 7.5bcm (bank cubic metres) of overburden per tonne of coal. The overburden material degrades quickly on exposure to the atmosphere and generally provides easy digging.
Some overburden rock requires blasting to ensure adequate fragmentation for the shovels. KPC carries out its own mining in most of the pits, but also contracts out a smaller proportion of its mining requirements.

The mine's loading fleet consists of over 20 large hydraulic shovels and backhoes with bucket capacities of up to 34m³. Leading suppliers include Hitachi, with nine EX3500 machines and six EX1800s, and Liebherr, which has six R996 Litronic shovels/backhoes on site.

Overburden haulage involves a fleet of 137 trucks, including Caterpillar 785s and 789Bs with capacities of 135–185t, Cat 777s (85t) and Komatsu HD785s (also 85t). Truck scheduling is carried out using a GPS-based Mincom dispatch and management system.


COAL PROCESSING

With selective mining, over 90% of the run-of-mine coal only needs crushing and blending to give export-quality Prima Coal. Coal from the seam roofs and floors contains more mineral material, and so has to be washed. This 'dirty Prima' and Pinang material is handled separately from the 'clean Prima', with individual streams for the different raw materials.

After crushing to –50mm in Gundlach rolls crushers, the washing plant uses dense medium cyclones for 0.5mm to 50mm feed, and spirals for the –0.5mm material, products being dewatered in centrifuges before blending into the Prima Coal stockpile.


OVERLAND TO THE PORT

The mine site contains separate stockpiles for the Prima and Pinang products, holding 60,000t and 35,000t respectively. Coal is reclaimed and transported by a 13km-long, 2,100t/h-capacity overland conveyor to Kaltim Prima’s dedicated port facilities at Tanjung Bara.

Further stockpiles hold a live capacity of 350,000t of Prima and 150,000t of Pinang coals. Coal is transferred directly from mine to ship whenever possible.

Vessels of up to 220,000dwt can be handled by the port, with loading facilities at the end of a 2km-long jetty. Twin quadrant loaders can each handle up to 4,700t/h, the normal loading throughput.


PRODUCTION

Since production began in 1992, Kaltim Prima has increased its output year-on-year, from 7.3Mt in its first year to some 17Mt in 2002 and 2003. PT Bumi is now expanding the Sangatta operation to 30Mt/yr, with a further 6Mt/yr to come from Bengalon.

The operation produced 27.6Mt in 2005, with a target for 2006 of 36Mt of coal and some 700Mt of overburden.